Laserfiche WebLink
<br /> Table VIII-A <br /> HYANNIS PEAK DAB - ZONED EARTHFILL DAM I <br /> ! <br /> (Impervious Core) <br /> COST ESTIMATE <br /> Subtotal Total <br /> Unit Per For ,:j <br />No. Item Quantity Price Item Category ! <br /> Preliminary '1 <br />1. Drilling & Testing L. S. $ $ 85.175 $ <br />2. Aerial Photos & Mapping L.S. 5',250 <br />3. Mobilization L.S. 63,000 <br /> 153,425 <br /> Foundation <br />4. Clearing & Grubbing 3 Ac 472 1,470 <br />5. Stripping 7100 SY 1. 58 11,235 <br />5a. Excavation 2300 CY 1. 58 3,675 <br />6. Foundation Preparation 400 SY 10,50 4,200 <br />7. Grouting 1550 LF , 10.50 16,275 <br />8. Grout Cap/Cutoff Wall 130 CY 157.5 20,475 <br /> 57,330 <br /> <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br /> <br />15. <br />16. <br />17. <br /> <br />18. <br />19. <br />20. <br /> <br />21. <br />22. <br />23. <br />24. <br /> <br />25. <br />26. <br /> <br />Dam <br />Zone I <br />Zone II <br />Chimney Drain & Blanket <br />Riprap <br />Bedding for Riprap <br />Instrumentation <br /> <br />21000 CY <br />53000 CY <br />2700 CY <br />3600 SY <br />600 CY <br />L.S. <br /> <br />Spillway <br />Riprap , <br />Stabilize D/S of Spillway <br />Concrete Weir Wall <br /> <br />2200 SY <br />L.S. <br />25 CY <br /> <br />Outlet Horks <br />30" Dia. Reinf. Conc. Pipe <br />Intake Gate & Access. <br />Outlet Structure <br /> <br />400 LF <br />L.S. <br />L.S. <br /> <br />Miscellaneous <br />Diversion <br />Seeding D/S Face <br />Access Road <br />New Ditch <br /> <br />L,S. <br />3400 SY <br />1. 5 mi. <br />L,S. <br /> <br />TOTAL <br /> <br />Contingencies <br />Engineering & Construction <br />Management <br /> <br />10% <br />8% <br /> <br />GRAND TOTAL <br /> <br />3.50 <br />2,63 <br />7.88 <br />15.75 <br />10.50 <br /> <br />10.50 <br />210 <br /> <br />36.75 <br /> <br />1. 05 <br />10,500 <br /> <br />66,150 <br />139,125 <br />21,315 <br />56,700 <br />6,300 <br />10,500 <br /> <br />" <br />300,090 :,1 <br />.;~ <br /> <br />23,100 <br />5,250 <br />5,250 <br /> <br />33,600 <br /> <br />14,700 <br />26,000 <br />15,750 <br /> <br />,;F,450 <br /> <br />10,500 <br />3,570 <br />15,750 <br />2,100 <br /> <br />31,920 <br />632.815 <br />63,280 <br />53,780 <br /> <br />749,87"> <br /> <br />:',:i <br /> <br />Note: These construction costs are based on 1981 figures. <br />At 8% inflation for two years these costs would <br />increase 116.4%, or $873,000, <br /> <br />-33- <br />