My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE <br />II -10 <br />-13 <br />II -14 <br />II-IS <br />-16 <br />II-17 <br /> <br />II-18 <br />V-I <br />V-2 <br />V-3 <br />V-4 <br />VI-I <br />VI-2 <br />VI-3 <br /> <br />VI-4 <br /> <br />VI-5 <br />VI-6 <br />VI-7 <br /> <br />NO. <br />1 <br />2 <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />Platte River Basin South Platte River at Littleton <br />Water Discharge Records <br />1982-1985 Discharge at Littleton (May-September) <br />Flow Duration, Number of Days of Selected Flow, <br />South Platte River at Littleton <br />Average Future Flow Conditions at Union Avenue, <br />Boating Season of May-September <br />Englewood Diversions at Union Avenue <br />Boating Season River Flows in cis, Littleton Gage <br />Unit Construction Costs <br />Estimated Construction Costs <br />Alternative Ratings <br />Water Surface Profiles <br />Entrance Gate HydrauliC Analysis <br />Alternative 4 Velocities at Various Locations <br />and Flow Rates <br />Alternative 5 Velocities at Various Locations <br />and Flow Rates <br />Unit Costs <br />Total Project Cost for Alternate Nos. 4 and 5 <br />Total Project Cost for Alternate Nos. 4A and 5A <br /> <br />DRAWINGS <br /> <br />Alternate No.1, Boatchute Over the Existing Dam Face <br />Alternate No.2, Boatchute Through the Existing Dam Face <br />Alternate No.3, Boatchute Through the Existing Dam Face <br />on the East Side <br />Alternate No.4, Boatchute on West Bank Adjacent to <br />Existing Dam Structure <br />Alternate No.5, Boating Course on the West Bank By- <br />passing the Dam <br /> <br />- v - <br /> <br />PAGE <br />II-l9 <br />-22 <br />II-18 <br />II-25 <br />-26 <br /> <br />II-27 <br />II-29 <br />V-2 <br />V-3 <br />V-3 <br />V-6 <br />VI-3 <br />VI -11 <br /> <br />VI-IS <br /> <br />VI -15 <br />VI-16 <br />VI -17 <br />VI-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.