My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00046
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153163
Contractor Name
Nunn, Town of
Contract Type
Grant
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />i. <br /> <br /> <br />i <br /> <br />&\1:' 1:'cmJ.l.h 1\ <br /> <br />" <br /> <br />. <br /> <br />HYDRO- TRIAD,lTD. <br />July 22, 1977 <br /> <br />I <br />I <br /> <br />.. <br />l <br /> <br />Mr. Nick Ioannides <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />823 Centennial Bldg. <br />Denver, CO 80203 <br /> <br />Dear Mr. Ioannides: <br /> <br />I <br />I <br /> <br />.. <br /> <br />Enclosed is our proposal for the Town of Nunn Water Supply Study <br />based upon the request from the CWCB. The proposal was prepared according <br />to the application by the town to the eWCB for assistance and the CWCB <br />guidelines for feasibility reports. <br /> <br />. We feel that one of the more important aspects of the study will be <br />the evaluation and recommendations regarding the source of water. In addition <br />the questions of water quality is. closely related and an important consideration. <br />We also feel that a complete study of the existing system along with the future <br />needs is important at this time and will be of particular benefit to the town <br />for future planning and budget scheduling for improvement to the water supply <br />system. <br /> <br />We appreciate the opportunity to offer our services to the CWCB and <br />the town of Nunn and hope to be able to work with their representatives to <br />define a good, reliable system that will economically meet the needs of the <br />town.in the future. We anticipate the duration of the study project would <br />be ten weeks, but if a shorter time frame is desired, we would be willing to <br />discuss the scheduling. <br /> <br />I <br /> <br />. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />Sincerely, <br /> <br />Q:-J/'; ;d j( <br /> <br />Ronald L. Halley, P.E. ~ <br />President <br /> <br />RLH/jh <br />Enc1 s: Proposal <br /> <br />- <br /> <br />I <br /> <br />APPENDIX A <br /> <br />. <br /> <br />7500 W. MISSISSIPPI AV.E. . SUITE 10 <br /> <br />LAKEWOOD, COLORADO 80226 <br /> <br />PHONE 303.934-2477 <br />
The URL can be used to link to this page
Your browser does not support the video tag.