My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00043
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:54:01 PM
Creation date
10/5/2006 11:30:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150100
Contractor Name
East Dillon Water District
Contract Type
Loan
Water District
5
County
Summit
Bill Number
Bill 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />supply system. The current purchase of the Vidler rights and wells enables the District to <br />independently operate and control the entire water supply system. including the physical structures <br />and system infrastructure. as \vell as the utilization of the supporting \\'ater rights. The following <br />sections provide the background information pertaining to the supply system. the need for the \vater <br />rights. and the sufficiency of the water rights. <br /> <br />Project Sponsor <br /> <br />The project sponsor forthe proposed watcrright purchase is the East Dillon Water District (District). <br />The District. which wa.s formed in 1969. operates as a special district in Colorado under Title 32 <br />CRS. The District relies on user fees and property taxes to fund operations and maintain the water <br />supply system. As discussed in a later report Section. the District has provided detailed financial <br />analyses regarding the purchase and revenues (Appendices E and F). The District has undertaken <br />planning and development projects over the years to provide adequate services to its customers. <br />These projects have included analyses of water resources. facility construction. and master planning <br />for the water supply system. <br /> <br />The District currently services approximately I J 17 taps. will serve approximately 1370 by the <br />summer of 2002. and the build-out service capacity is estimated to be approximately 1.837 taps <br />(SBG. 1998). The water customers within the District are primarily residential units. including <br />single-family homes. duplexes. and condominiums. The District provides scrvice to an area of <br />Summit County referred to as "Summit Covc". which is approximately 1.8 square miles in size and <br />located about three miles south of the TO\\TI of Dillon and on the east bay of DilJon Reservoir. as <br />presented in the attached Figures 1 and 2. (SBG. 1998). The District contracts with a water <br />operations contractor to manage. operate. and maintain the water supply' system. The District utilizes <br />an integrated supply system. including ground water wells. pumps. distribution pipelines. treatment <br />and storagc facilities. which arc described in detail in the 1998 SBG report. <br /> <br />Loan Request <br /> <br />The District is requesting a 3D-year loan for S2.55 million. which represcnts 75 percent of the $3.40 <br />million purchase price of the assets to be acquired. cwes Lending Policy No.8 states in part that <br />" the costs of waler rights acquisition are eligible for a ewcs loan if the purchase satistics an <br /> <br />-1- <br /> <br />I !l1_\llI)/,.H"').."k'II.I'-\'~.I<lII',IIl( <br />
The URL can be used to link to this page
Your browser does not support the video tag.