My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00038
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153468
Contractor Name
Upper Yampa Water Conservancy District
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-E.,," <br /> <br />.- <br />\ <br /> <br />.\ <br /> <br />p, <br /> <br />Task 5 - Prepare an appraisal of the water rights associated with the <br /> <br /> <br />Stagecoach project in terms of the amount of water the project will <br /> <br /> <br />deliver on an annual basis. or other basis suitable for placing a value <br /> <br /> <br />on the water right. Data used as a basis for the appraisal will include <br /> <br /> <br />informat ion obtained on water sa les In the Yampa area. water sales In <br /> <br /> <br />other areas of the State. comparison of values of land with and without <br /> <br /> <br />irrigation water. and comparisons of prices of project water from other <br /> <br /> <br />pro jects such as Yamco 10. Green Mounta in and Rued i. <br /> <br />Est. Cost Sl.lOO.OO <br /> <br />Task 6 - Prepare a report to the Colorado Water Conservation Board giving <br /> <br /> <br />the opinion of the value of the rights. The report will contain a <br /> <br /> <br />summary of the work performed in Phase I as we 11 as the procedure and <br /> <br /> <br />basis for which the appraisal was made. The list of documents reviewed <br /> <br /> <br />as well as individuals contacted will be included with the report. <br /> <br />Est. Cost Sl.500.00 <br /> <br />Subtotal <br />Configuration (10%) <br />Other Direct Costs. including <br />t rave 1. mea Is. lodg ing. <br />printing. etc. <br /> <br />S7.000.00 <br />700.00 <br /> <br />Direct Cost <br /> <br />" <br /> <br />1.000.00 <br /> <br />TOTAL <br /> <br />S8.700.00 <br /> <br />SUMMARY OF HOURS <br /> <br />Principal-in-Charge <br />Project Manager <br />Staff Hydrologist <br />Support <br /> <br />5 hours <br />20 hou rs <br />116 hours <br />8 hou rs <br />
The URL can be used to link to this page
Your browser does not support the video tag.