My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00037
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 2:42:46 PM
Creation date
10/5/2006 11:30:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153386
Contractor Name
San Luis Valley Irrigation District
Contract Type
Loan
Water District
20
County
Hinsdale
Bill Number
SB 82-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'~\ <br /> <br />'-\ <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM.PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />Z. PreparatIon of detailed plans and specIfications for <br />authorIzed projects by consulting engine~ring firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />$taff (plans and specifications for storage dams and <br />reservoIrs must also be approved by State Engineer's <br />offIce). <br /> <br />4. Board staff approval of bIdding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. Constructlon commendes. The Board staff makes periodic <br />Inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for fln~l inspection. <br /> <br />9. Final inspection and acceptance of as-buIlt project by <br />Board staff. <br /> <br />10. Submittal of as-built drawIngs to Board staff for <br />approval and fILIng. <br />
The URL can be used to link to this page
Your browser does not support the video tag.