My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00037
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 2:42:46 PM
Creation date
10/5/2006 11:30:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153386
Contractor Name
San Luis Valley Irrigation District
Contract Type
Loan
Water District
20
County
Hinsdale
Bill Number
SB 82-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SAN LUIS VALLEY IRRIGATION DISTRICT <br /> <br />296 MILES STREET P. O. BOX 637 <br />719.754.2254 <br />CENTER, COLORADO 81125 <br /> <br />September 24, 1999 <br /> <br />RECEIVED <br /> <br />SEP 2 7 1999 <br />Col:l.':.<lo lYaret <br />~licel1 <br /> <br />Peter Evans, Director <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Re: San Luis Valley Irrigation District <br /> <br />Dear Mr. Evans: <br /> <br />The San Luis Valley Irrigation District requests a meeting with you <br />to discuss the possibility of obtaining a deferral of its loan payments to <br />the Colorado Water Conservation Board so that the District can fund <br />essential repairs to the outlet works at Rio Grande Reservoir this winter. <br />At the conclusion of the 1999 irrigation season the District discovered <br />that high releases from the Reservoir had damaged the outlet works. That <br />damage must be repaired this winter and it is anticipated that the work <br />will cost in exceSs of $100,000.00. This needed repair work follows over <br />$75,000.00 in repairs that the District was required to. make at the <br />Reservoir during the winter of 1997-98. Needless to say, the District's <br />coffers are being strained. <br /> <br />~:\ <br />"/ <br /> <br />The District would, therefore, like to discuss the possibility of <br />obtaining a .deferment on the payments of two of its. loans from the CWCB: <br />Contract #C-153386, for which the annual payment is $30,014.20; and <br />Contract #C-153478, for which the annual payment is $30,660.37.. Both these <br />loans were made to the District in the late 1980s to fund repair and <br />replacement of the Dam's outlet gates. The 1999 payment on Contract #C- <br />153386 was made in August of this year, and the 1999 payment on Contract <br />#C-153478 is due in December. <br /> <br />We are available to. come to Denver to meet with you and the <br />appropriate members of your staff at your earliest convenience. The <br />District's Superintende~t, Travis Smith, will be calling you to determine <br />when such a meeting can be held. <br /> <br />Thank you for your assistance in this matter. <br /> <br />cc: Tod J. Smith <br /> <br />Sincerely, <br /> <br />qf!( tt~nt <br /> <br />Rio Grande Reservoir Capacity. 51,113 acre feet <br />Irrigation Ditches in Operation. 135 miles Drainage Ditches in Operation. 60 miles <br />
The URL can be used to link to this page
Your browser does not support the video tag.