My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00036
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153533
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />'".1 <br />"..I <br />" <br /> <br /> <br />"-I <br />." <br /> <br />'d" <br /> <br />,:1 <br /> <br />,", <br />';'.' <br />:" <br /> <br /> <br />'. <br /> <br />.';" <br />, <br /> <br />'I <br />,:'1' <br />:""'. <br /> <br />>1: <br />" <br /> <br /> <br />:;. <br />/. <br /> <br /> <br />" <br /> <br />:':1 <br />",\ <br />1 <br /> <br />" <br /> <br />,"~I <br />:;. <br />;,1 <br />1 <br />\; <br />.:' <br />;. <br /> <br />SYNOPSIS <br /> <br />Presented within this Feasibility Study are: <br /> <br />(1) a general <br /> <br />description and history of the Santa Maria Dam, along with water sour- <br />ces and storage rights; (2) background on the Santa Mari a Reservoi r <br />Company, including history, legal, financial, and reservoir system <br />operational aspects; (3) description of the seepage mitigation pl ans <br />based upon technical considerations and water storage needs; and (4) <br /> <br />project costs, economic evaluation, and financial program including a <br />100 percent funding request for the recommended repairs. The study <br />and report were prepared for the Santa Maria Reservoir Company by <br /> <br />Hydro~Triad, Ltd. <br /> <br />This report sets forth the need plus the technical and economical <br /> <br />feasibility of this project to mitigate seepage problems at Santa <br /> <br />Maria Dam, thereby removing the current storage restriction of 32,000 <br />acre~feet and restituting more than 11,000 acre-feet of storage <br />capacity. Seepage mitigation is provided by the addition of an imper- <br />meable clay liner placed on the upstream face of the embankment to <br />blanket the locations identified during the geotechnical investiga- <br />tions as areas of seepage. <br /> <br />The estimated cost of the project is about $225,000 (1988 <br /> <br />dollars) and the present worth of the benefits far exceeds the costs. <br /> <br /> <br />The benefit cost ratio is 3.1. Indirect benefits of the project have <br /> <br />not been quantified but include storing out-of-priority water for Rio <br /> <br />Grande Compact admi ni strati on purposes. <br /> <br />The reservoi r is a pre- <br /> <br />Compact reservoir. <br /> <br />- i i - <br />
The URL can be used to link to this page
Your browser does not support the video tag.