My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00035
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0023X
Contractor Name
Dominguez Reservoir Project BuRec 1984
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY AND CONCLUSIONS (Continued) <br /> <br />. <br /> <br />it is believed that most of that area will have adequate supplies when <br />developments now under construction or being planned are completed and <br />operational. <br /> <br />In addition to the M&I needs of the Grand Valley, it was noted that <br />the oil shale industry to the north of the project area might require as <br />much as 834,000 acre~feet of additional water for mining and extraction <br />processes and related population uses. Also, the unsatisfied water de- <br />mand of the Denver Metropolitan Area will be 94,000 acre-feet by 2010, <br />according to the most optimistic projections of the Denver Region Council <br />of Governments. Other future needs have been noted, though unquantified, <br />including those of the coal industry and other front range cities. An <br />unmet need exists for more than 2 million additional recreation-days, <br />according to the Colorado State Comprehensive Outdoor Recreation Plan <br />(SCORP) of 1976. These demands include boating, swimming, waterskiing, <br />hiking, camping, picnicking, hunting, and fishing. <br /> <br />. <br /> <br />A need also exists to improve the late season water quality of the <br />Gunnison River through the terminal reach where the city of Grand Junc- <br />tion pumps auxiliary M&I supplies and where irrigation water is diverted <br />for lands west of Grand Junction. The average total dissolved solids <br />through this reach range from a flow-weighted mean of 372 milligrams per <br />liter (mg/L) in May to 1,130 mg/L in September. Individual late season <br />samples have tested as high as 2,316 mg/L. <br /> <br />It was determined that a need exists in the area for about 14,000 <br />acre-feet of water to irrigate an estimated 4,000 acres of land. About <br />half this land is presently unirrigated, while the other half is irri- <br />gated, but with an inadequate water supply, especially in late summer <br />when streamflows are low. Concern has also been expressed that the <br />farming operations in the Gunnison River Canyon should be continued. <br /> <br />Fish and wildlife needs identified are for preservation or enhance- <br />ment, and there is also a recognized need to preserve prehistoric, <br />historic, and paleontologic resources in this area. <br /> <br />During project investigations more than 40 general alternatives <br />were considered, incorporating various combinations of identified fea- <br />tures and differing levels of development. The alternatives were ini- <br />tially screened with emphasis on technical and economic considerations, <br />practicality of implementation, and public recommendations. Several <br />alternative components were analyzed to provide water for M&I use and <br />irrigation; however, since irrigation was found to be an economically <br />infeasible component, it was not included in any of the candidate plans. <br />Different development levels were considered, with and without peaking <br />power. Five sites for Dominguez Dam and nine sites for pump back forebay <br />reservoirs were studied, and plans were eliminated that included unsatis- <br />factory dam or pump storage forebay sites. <br /> <br />. <br /> <br />Nine plans were selected for further consideration. In essence, <br />these plans were the ones that best withstood the tests of completeness, <br />effectiveness, efficiency, and acceptability. Six of the alternatives <br /> <br />S-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.