Laserfiche WebLink
<br />,\ <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br /> <br />ROUTING NUMBER: (J /01 G <br /> <br />$ 6S,,<QJ<QJ<Q, <br /> <br />lFlEASIIIB\1I1LIITY R1E1P'ORT !LOAN CONTRACT <br /> <br />. This CorntJrillct, made this / J day of~m.f{;? 1997,byand <br />between the State of Colorado for the use and benefit of th epartment of Natural Resources, <br />Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, and the <br />LOWER ARKANSAS WATER MANAGEMENT ASSOCIATION, P. O. Box 1161, Lamar, CO 81052 <br />hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />IFACTUAIL RECITALS <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in <br />Fund Number 424, Organization YYYY, Appropriation FSL, GBL L756, Program WTRC, <br />Object Code 5120, Reporting Category 3756, Contract Encumbrance Number C153756 <br />. . <br />B. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />C, Pursuant to the provisions of SS 37-60-119 and 37-60-122(1)(c),C.R.S. (1990 and Supp. <br />1996), the STATE is authorized to loan money for the construction of certain water projects for <br />. the benefit of the people of the State of Colorado, and to expend monies for feasibility studies <br />on such projects, provided that the borrower assures repayment of that money. <br /> <br />D. The BORROWER has applied to the STATE for a loan to conduCt a feasibility study for obtaining <br />additional water sources for its augmentation program in the Arkansas River Basin, hereinafter <br />referred to as STUDY, at a cost of $65,000. <br /> <br />E. The BORROWER is a duly constituted Colorado non-profit corporation formed under S 31-24-1 <br />et sea. C.R.S., for the primary purpose of providing replacement water to its members. <br /> <br />F. At its January 29-30, 1997, meeting, the CWCB approved a loan to the BORROWER in an <br />amount not to exceed $65,000 (100% of the cost of the STUDY) at an interest rate of 3X.% per <br />annum, and for a duration of 10 years. <br /> <br />G. The STATE now desires, by this contract, to loan money to the BORROWER for this STUDY upon <br />mutually agreeable terms and conditions. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained, <br />the parties agree as follows: <br /> <br />1. Preparation Of Feasibility Report. The BORROWER shall have a feasibility report prepared <br />on the PROJECT. The State has approved a scope of study for the Feasibility Report prepared <br />by the BORROWER. The scope of study is attached hereto as Appendix A and incorporated <br />herein. <br /> <br />2. Final Report. Two (2) copies of the final report of the feasibility study prepared in compliance <br /> <br />Feasibility Report Loan Contract <br /> <br />Page 1 of 9 <br />