My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00032
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:56 AM
Creation date
10/5/2006 11:30:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153465
Contractor Name
City of Cortez and Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BROWN AND CALDWELL I ~~~ <br />CONSULTING ENGINEERS <br /> <br />Harch 28, 1986 <br /> <br />Mr. Nick Ioannides, Chief <br />project Planning and Construction section <br />Colorado Water Conservation Board <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80209 <br /> <br />21-2280/1 <br />21-2280/22 <br /> <br />Subject: Cortez Raw Water Supply pipeline <br />Feasibility Report <br /> <br />Dear Mr. Ioannides: <br /> <br />Brown and Caldwell is pleased to submit this Feasibility Report of <br />our investigations and recommendations for the above project. This <br />report has been reviewed with the Colorado Water Conservation Board <br />staff and with the City of Cortez staff. Comments received from <br />their reviews have been appropriately addressed in this report. <br />survey and geotechnical analyses have been completed, and are <br />transmitted with this report. <br /> <br />We wish to acknowledge the assistance and cooperation we received <br />during this study from Mr. Bruce Smart, Public Works Director for the <br />City of Cortez. <br /> <br />Y~urs very truly, <br /> <br />BROWN AND CALDWELL <br /> <br />Craig A. Goehring <br />project Manager <br /> <br />Robert J. Bolton <br />project Engineer <br /> <br />RJB:lcv <br />Enclosures <br /> <br />cc/encl: Mr. Bruce Smart, Public Works Director, City of Cortez <br /> <br />10200 E. GIRARD AVE., SUITE 8-325' DENVER. CO 80231 (303) 750-3983 <br />
The URL can be used to link to this page
Your browser does not support the video tag.