Laserfiche WebLink
<br />, <br /> <br />. . <br />'Co""ltrado \late,' Conservatlon Itoard' <br />CORTEl PI PELINE <br />Feasibility Study <br /> <br />SCHEDll..E-E SLI'~ARY OF COSTS <br /> <br />[lr<own and Caldwell <br />CorrSulting Erlgineers <br />Denver, (:('Iorado <br /> <br />March 8, 1 Sa5 <br /> <br />Itelll <br /> <br />=============::=~===--==================-..,;;:========--==-~---======== <br /> <br />Cost <br /> <br />Direct labor Costs CRefer Schedule B) <br /> <br />Indirect labor Costs <br />Salary Fringes 135j. of direct labor costs) <br />Gen. and Adrlin. U30j of dinct labor costs) <br /> <br />Total Labor Costs <br /> <br />Direct Expenses (Refer Schedule D) <br /> <br />Subcontractors IRefer Schedule Cl <br /> <br />Professional Fee <br /> <br />fotal Contract Cost <br /> <br />9596.68 <br /> <br />JJSa.B4 <br />12\75.68 <br /> <br />25m.20 <br /> <br />3260.00 <br /> <br />14B50.00 <br /> <br />4556.B0 <br /> <br />4B098.00 <br />