Laserfiche WebLink
<br />I <br /> <br />Table 5-1 Summary of Alternatives <br /> <br />I <br /> <br />I <br /> <br />Alignment description <br />from intake structure <br />to WTP <br /> <br />Al terna t i Va <br /> <br />Advantages <br /> <br />1 <br /> <br />Parallel existing <br />alignment <br /> <br />Disadvantages <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Construction <br />along the <br />raw water line <br />easement will <br />reduce right- <br />of-way <br />acquisition. <br /> <br />Minimal utility <br />interference. <br /> <br />Use existing <br />Highway 145 <br />crossing. <br /> <br />Total pipeline <br />length is less <br />than Alternative <br />3. <br /> <br />Easement may be <br />difficult to <br />for land north <br />oJ Highway 145. <br />(3.6 acres) <br /> <br />I <br /> <br />2 <br /> <br />I <br /> <br />Southeast, across <br />open country to <br />Highway 145. parellel <br />Highway 145 on west <br />side, south to existing <br />highway crossing <br />(within public row). <br />Use existing crossing, <br />then parallel existing <br />alignment to WTP. <br /> <br />I <br /> <br />I <br /> <br />Use of existing <br />Highway 145 <br />crossing. <br /> <br />Avoid easement <br />acquisition for <br />land north of <br />Highway 145. <br />(5.5 acres) <br /> <br />Easement may <br />be difficult <br />to obtain <br />for land <br />between intake <br />structure and <br />Highway 145. <br />(5.5 acres) <br /> <br />Alignment is <br />longer than <br />Alignment 1. <br /> <br />Potential <br />for utility <br />interference. <br /> <br />3 <br /> <br />I <br /> <br />Southeast, across open <br />country to Highway 145. <br />Parallel Highway 145 on <br />on west side, south to <br />Lakeview Road. Then <br />east under Highway 145 <br />along south side of <br />Lakeview to existing <br />alignment, then south <br />to WTP. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Avoid easement <br />acquisition for <br />land north. of <br />Highway 145. <br />(5.5 acres) <br /> <br />Easement may be <br />difficult to <br />obtain for land <br />between intake <br />structure and <br />Highway 145. <br />(5.5 acres) <br /> <br />Alignment is <br />significantly <br />longer than <br />Alignments <br />1 or 2. <br /> <br />Potential for <br />utility <br />interference. <br /> <br />Highway <br />crossing <br />required. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />~ :: <br />