My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00032
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:56 AM
Creation date
10/5/2006 11:30:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153465
Contractor Name
City of Cortez and Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3-5 <br /> <br />projected Water Demands <br /> <br />The raw water supply required for the Cortez Water Treatment <br />plant is based on the assumed flow and population criteria discussed <br />above. The projected raw water demands are shown on E'igure 3-4 <br />and given in Table 3-8. This figure includes an additional 15 <br />percent demand for Towaoc, based on water consumption projections by <br />the Ute Hountain ute Tribe. <br /> <br />Based on a 3 percent _growth rate, the projected maximum day raw <br />water supply required at the end of the 50-year planning period for <br />Cortez and Towaoc is approximately 27.8 million gallons per day. <br />Additionally, we have generated a curve based on a 2 percent <br />population growth. This curve shows the lower end of the water <br />demand range based on population. <br /> <br />BROWN AND CALDWELL C <br /> <br />CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.