Laserfiche WebLink
<br />" <br /> <br />Colorado \.later Conservat ion Board <br />CORTEZ PIPElINE <br />Feasibility Study <br /> <br />8rown and Caldwell <br />Cc'Muiting Engineers <br />Denver, Cc,Jorado <br /> <br />SCHEDUlE-B Sil'JIARY OF DIRECT lABOR CliSTS March B, 1\65 <br />--- ~= =====--===--== --===--=== <br /> <br />Classification <br /> <br />Total <br />Hours <br /> <br />Chief Engineer ICE) <br />Managing Engineer (JI!E] <br />Supervising El"lqini!er ISPE) <br />Princi!,al Engineer (PE) <br />Senior Engineer (SE) <br />fngineer iEng) <br />Technician !Tech) <br />Clerical (Cler) <br /> <br />'0 <br /> <br />56 <br />156 <br />1M <br />110 <br />56 <br /> <br />!DTALS <br /> <br />512 <br /> <br />'1596.58 <br />