My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00030
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br />I <br />. <br />I <br />I <br />. <br />I <br /> <br />(Colorado River at G1enwood Springs) and 9-0850 (Roaring Fork River <br />at G1enwood Springs) for the years 1941 through 1966 and the recorded <br />flows at USGS gaging station 9-0851 (Colorado River below G1enwood <br />Springs) for the years 1967 through 1977. This period contains the <br />low flow years of 1954 and 1977 as well as the high flow years of <br />1957 and 1962. <br /> <br />From the above it should be apparent that the physical availability <br />of streamflows at the water system intake will not be a controlling <br />factor. For the same reasons the maintaining of minimum levels of <br />instream flows to protect the natural environment will also not be <br />a limiting factor. However, the West Divide Project water rights <br />discussed in a subsequent section of this chapter are junior in priority <br />to major existing diversions downstream of Cameo and to a number of <br />major conditional water rights located both upstream and downstream of <br />Rifle. The senior rights could pre-empt the legal ability of the <br />proposed South Rifle Division to divert from the river under the trans- <br />ferred West Divide Project water right, Therefore, the West Divide <br />District will obtain supplemental supplies from existing federal <br />storage reservoirs upstream. <br /> <br />In previous investigations of the West Divide Project made by The <br />David E. Fleming Company for the West Divide Water Conservancy District <br />and the Colorado River Water Conservation District, operation of the <br />Colorado River basin, exclusive of the Gunnison River, under future <br />conditions of development was simulated using the proprietary CORSIM <br />II computer program. Table IV-6 lists the amounts of water which would <br />be available to a 185 cfs West Divide Project direct diversion right <br />from the Crystal River at Placita. These values were obtained from <br />the CORSIM simulation for a realistic ultimate level of development <br />of the basin. <br /> <br />IV-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.