My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00025
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:36:27 AM
Creation date
10/5/2006 11:29:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150106
Contractor Name
Glenwood Irrigation Company c/o The Thompson Glen Irrigation Company
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />PROJECT SUMMARY - BORROWER - CONTRACT No. C1501 06 <br /> <br />SECTION 1 -BORROWER INFORMATION . <br />Name:. The Glenwood Irrigation Company <br />Address: P,O. Box 27 <br />Glenwood Springs, Colorado 81602 <br />Ray Thompson, Corporate Secretary <br />970-945-6746 <br />sandyj@rot.net <br />Colorado nonprofit corporation <br /> <br />Contact: <br />Phone Number: <br />E-mail address: <br />Type of Entity: <br /> <br />SECTION 2 - PROJECT DESCRIPTION <br /> <br />A, Description of Project: Rehabilitation of the siphon on the Glenwood Ditch located in <br />Garfield County at an estimated cost of $514,250, <br /> <br />S., Description of Feasibility Study: The eWCB reviewed a feasibility report on the PROJECT <br />compiled by Mike Kishimoto and Dennis Davidson of the Glenwood Natural Resources <br />Conservation Service, which is incorporated herein by reference, and based upon this <br />feasibility report, the CWCS determined the report meets the requirements of the CWCB <br />Construction Fund Guidelines for feasibility studies, <br /> <br />SECTION 3 - BOARD ApPROVAL AND LEGISLATIVE AUTHORIZATION <br /> <br />A. At its May 2002 meeting, the CWCB approved a loan to the BORROWER in an amount up to <br />$386,000, at an interest rate of 4% per annum for a repayment term of 30 years. <br /> <br />B. Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to $1,000,000 <br />from the CWCS's Construction Fund and the State Severance Tax Trust Fund Perpetual <br />Base Account Fund without prior approval from the General Assembly <br /> <br />SECTION 4 - COLLATERAL <br /> <br />Part of the security provided for this loan, as evidenced by the executed Deed of Trust <br />attached as Appendix 5 and incorporated herein, shall be an undivided one hundred percent <br />(100%) interest in the Glenwood Ditch siphon structure, as more particularly described in the <br />attached Deed of Trust, hereafter referred to as the Collateral, <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />The only existing debt of the BORROWER is a loan in the amount of $85,000 from the CWCB <br />(Loan Contract C150086 dated March 20,2002). <br /> <br />SECTION 6 - DiSBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a statement of the.. <br />PROJECT costs expended for that period and shall.fo/Ward said statement to the CWCB. After <br />receipt of the periodic progress report from the BORROWER, and review and acceptance of the <br />items therein as eligible expenses as described below, the CWCB will pay to the BORROWER the <br />amount set forth in the report or such portion that has been approved by the CWCB, Such <br />payment shall be made within thirty (30) days from the CWCB'sapproval of each progress <br /> <br /> <br />Appendix 1 to Loan Contract 150106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.