Laserfiche WebLink
<br />SCHEDULE A <br /> <br />COLOHAIlO WAIEH CONSEHVATlON 1l0AHIl <br />CUN5TUUCTIUN FUND PUUCU^" PUUCEUUULS <br /> <br />1. BOdrd approval of engineering firm and engIneering <br />agreement between en~lneerlng firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consuLting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />offlce). <br /> <br />4. BOdrd stdff approval of bidding for the project. BOdrd <br />starf present at bId opening for construction. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the BOdrd staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approvai of <br />construction schedule by BOdrd staff. <br /> <br />7. Construction commences. The BOdrd stdff makes periodic <br />inspections during construction. Ail chdnge orders must <br />be dpproved by the BOdrd stdff in ddvdnce dnd before dny <br />construction on chdnge items Cdn commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project hds <br />been completed dccordlng to dpproved drdwings dnd <br />specifications and drrdnges for findi inspection. <br /> <br />9. Final inspection dnd dcceptance of as-built project by <br />,Bodrd staff. <br /> <br />10. Submittal of as-built drawIngs to BOdrd staff for <br />approval dnd filing. <br />