My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00023
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153270
Contractor Name
Dufford, Waldeck, Ruland and Milburn
Contract Type
Grant
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />consultant (as specified above), the reports required, the <br /> <br /> <br />schedule for the work, the total remuneration due to the <br /> <br /> <br />consultant (which shall be a fixed sum), and such other matters <br /> <br /> <br />as are necessary to define the contractual obligations of the <br /> <br /> <br />parties for the work to be done. <br /> <br />Schedule <br /> <br />Work shall be commenced by the selected consultant when it <br />is given notice to proceed, which notice shall be given <br />immediately upon the state's approval of a contract with the <br />Board. It is anticipated that it will take about 3 weeks from <br />. the date that proposals are due to select a consultant and enter <br />into a contract with it. <br /> <br />The preliminary draft of the consultant's report shall be <br />due 30 days after the notice to proceed is given. The Board <br />shall review this draft within 7 days. The final report to the <br />Board shall be due 7 days after that. <br /> <br />If persons or firms responding to this request for bids <br /> <br /> <br />cannot meet this schedule, then they should indicate the <br /> <br /> <br />alternative schedule which they would propose to meet. However, <br /> <br /> <br />the Board reserves the right to reject proposals which cannot <br /> <br /> <br />meet the requested schedule for completion of the draft and final <br /> <br /> <br />reports. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.