My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00022
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:29:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153568
Contractor Name
Coon Creek Reservoir & Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />I <br />I <br /> <br />December 15, 1988 <br /> <br />I <br /> <br />Mr. Nick Ioannides <br />823 state centennial Bldg. <br />1313 Sherman st. <br />Denver, co 80203 <br /> <br />I <br />I <br />I <br /> <br />RE: Feasibility Report for Coon Creek Reservoirs #1 and #2, <br />Mesa, County <br /> <br />Dear Mr. Ioannides, <br /> <br />I <br /> <br />Enclosed are two copies of the Feasibility Report for <br />Rehabilitation of Coon Creek Reservoirs #1 and #2, owned by <br />the Coon Creek Reservoir and Ditch Company. This report has <br />been prepared by our consultant, WestWater Engineering of <br />Palisade, Colorado, in compliance with CWCB guidelines. <br /> <br />I <br /> <br />The state Engineer has ordered extensive rehabilitation <br />work on Coon Creek Reservoir #1 and minor repair work to Coon <br />Creek Reservoir #2. Water level restrictions have been <br />imposed upon the reservoirs as a result of the repair order. <br />Coon Creek Reservoir Company has already expended $21,000 for <br />engineering design and preliminary construction. The <br />estimated cost to complete the rehabilitation project for <br />both reservoirs is $90,000. The Coon Creek Reservoir and <br />Ditch Company has applied for and is requesting approval of a <br />low-interest 40-year loan from CWCB in the amount of $45,000. <br />This Feasibility Report provides the basic technical and <br />financial data for evaluation of our loan request. The <br />remainder of the funds will come from the Coon Creek <br />Reservoir and Ditch Company through a loan to be obtained <br />through a private source. <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />Please review the report and let us know if you have any <br />comments. We would be pleased to meet with you at your <br />convenience. <br /> <br />I <br />I <br />I <br />I <br /> <br />Sincer.ely, ~ <br />Aj----- -J /"/ / <br />C -/ - <br />( ~/ d~;0:::-O-. <br />~'~~? V ~ <br />Harold Harv~-,___ President <br />Coon Creek Reservoir & <br />Ditch Company <br /> <br />HH/sc <br />
The URL can be used to link to this page
Your browser does not support the video tag.