Laserfiche WebLink
<br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />3.1 - Diversion Rights <br />3.2 - Storage Rights <br />3.3 - Diversion Alternatives <br />3.4 - Alternatives Evaluation <br />3.5 - Cost Estimates <br /> <br />PAGE <br /> <br />1-1 <br /> <br />2-1 <br /> <br />2-1 <br />2-4 <br />2-5 <br /> <br />3-1 <br /> <br />3-1 <br />3-2 <br />3-3 <br />3-8 <br />3-13 <br /> <br />4-1 <br /> <br />4-2 <br />4-2 <br />4-6 <br />4-6 <br /> <br />5-1 <br /> <br />5-1 <br />5-2 <br />5-7 <br /> <br />CHAPTER 1 - EXECUTIVE SUMMARY <br />CHAPTER 2 - INTRODUCTION <br /> <br />2.1 - Project Background <br />2.2 - Purpose of Study <br />2.3 - Existing Conditions <br /> <br />CHAPTER 3 - NORTH FORK TO JUNIATA DIVERSION ALTERNATIVES <br /> <br />CHAPTER 4 - EXPANSION OF REEOER RESERVOIR <br /> <br />4.1 - Storage/Diversion Rights <br />4.2 - Expansion Alternatives <br />4.3 - Recommended Plan <br />4.4 - Cost Estimates <br /> <br />CHAPTER 5 - REEDER RESERVOIR FLOW LINE INTERCONNECT <br /> <br />5.1 - Pipe Design Alternatives <br />5.2 - Alignment Considerations <br />5.3 - Cost Estimates <br /> <br />APPENDIX <br /> <br />- Geotechnical Report <br />- Dam Safety Reports <br />