My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153333 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153333 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:43:55 AM
Creation date
10/5/2006 11:29:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153333
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Furm 1>-'\('-01'\ <br /> <br />DE <br /> <br />MENT OR AGfNCY NUMBER <br /> <br /> <br />NUMBER <br /> <br />CONTRACT <br /> <br />$ 350,000 <br /> <br />THIS CONTRACT. made this 15th day of September <br />Slllle of Colorado for the IIse and benefit of lile Dell<1rtmcnl of '1 <br />(Colorado Water Conservation Board) <br />hereinafter referred to as the State, and '2 Beaver Park <br />Penrose, Colorado 81240 <br />hereinafter referred to as lhe conftllClor. <br /> <br />IS aD, by and between the <br />Natural Resources <br /> <br />Water InC.. P.O. Box 286. <br /> <br />WHEREAS, authority exists ill Ihe law and Funds have been budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered b.::lance thereof remains Dvai ble for payment in Fund Number dClnR <br />elL Account Number 53042\ Contract Encumbrance Number ~ ~3:\,; Dl1d <br /> <br />WHEREAS, rcquin'd approval. clearance and coordination has heen accomlllished from and with appropriate <br />llgellcics; and <br /> <br />WHEREAS, 'J pursuant to the provisions of 37-60-119, Colorado Revised Statutes <br />1973, as amended, the State is authorized to construct certain water projects for <br />the benefit of the people of the state; and <br /> <br />WHEREAS, the Contractor is a mutual ditch company in the State of Colorado <br />;;lod wishes to undertake t'epairs of their irrigation system hereinafter called <br />the project, for the Beaver Park water shareholders in ~remont County, Colorado, <br />at an estim41.ted cost of 1'hrce Hundred Fifty Thousand Dollars ($350,000); and <br /> <br />WIIEREl\S, 0. feasibility investigation of said project was conducted and it <br />was found that such a prOject is economically feaSible; and <br /> <br />WHEREAS, the State h~s agreed to construct said project and to sell the same <br />to the Contractor upon m~tually agreeable terms and conditions, subject to the <br />approval of appropriatio~s for that purpose by the Colorado General Assembly <br />and the Governor of the ~tate of ColoradO; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 67, FiftY-Second General Assembly of <br />the State of Colorado, d~ly enacted by the Colorado General Assembly and approved <br />by the Governor of the State of COlorado, there was appropriated to the Colorado <br />Water Conservation Board the sum of Six Hundred Thirty Thousand Dollars ($630,000) <br />for construction of the Seaver Park project; <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants herein <br />contained, it is agreed bY the parties hereto as follows: <br /> <br />^. The Contractor agrees that it will: <br /> <br />1. Cause the construction of said project to be completed within two (2) years <br />of the date of this contract in accordance with the proj~ct plans and specifications <br />and any necessary modification thereof approved by the state. No payments will be <br />made under this contract until the projec~ plans and specifications are approved <br />by the state. The above-men~ioned time m~ be extended py the State if such time is <br />insufficient because of acts of God or other acts or circumstances beyond the control <br />of the Contractor. <br /> <br />2. Conveyor cause titlo to be conveyed by deed or other proper conveyance to <br />the Colorado Water Conservation Board, Department of Nat~ral Resources, State of <br />Colorado, th~ following portions of the proposed project facilities: <br /> <br />(a) Beaver Park Diversion Dam, located nn Beav~r ~reek in t~e NE~ of th~ <br />NE~ of Section 16, T. 18 s, R. 68 W. 6th Princip~l Meridian. The dam is <br />a COncrete ogee secfion 30 feet hi9h and 95 feet wide with two outlet gates. <br /> <br />(b) Beaver Park upper Canal, beginning in NE~ of SE~ of Section 28 and ending <br />in NE~ of SEJ..i of section 29, T. 18 S, R.68 W. 6tJl Principc<l Meridian wHit a <br />length of 9,500 feet and consisting of a concrete lined ditch with a three- <br />foot width and three-foot depth. <br /> <br />(c) Brush Hollow Dam Inlet and Outlet structurep located in NW~ of m1~ of <br />Section 30, T. 18 S, R. 68 W. 6th Principal Meriaian. <br /> <br />(d) Beaver Park <br />30 and ending in <br /> <br />Lower Canal, beginning at a poi~t in NW~ of SW~ of Section <br />the SE~ of NE~ of Section 31, T. 18 S, R. 68 W. 6th principal <br />Page I of l pages <br />*(Sce instructions on reverse or la51 page,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.