My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00014
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2010 10:03:59 AM
Creation date
10/5/2006 11:29:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150011
Contractor Name
Consolidated Mutual Water Company, The
Contract Type
Loan
Water District
7
County
Jefferson
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ProDosed Proiect <br /> <br />The Fortune reservoir site is located about Yz mile northwest of the intersection of <br />Highway 72 and Indiana Street on a dry tributary of Big Dry Creek in the City of Arvada, <br />as shown on the attached map. The site encompasses about 250 acres ofland with no <br />existing structures. <br /> <br />The proposed dam is a lOS-foot high, zoned earth embankment with a crest length of <br />5,000 feet impounding a reservoir with a capacity of about 9,000 acre-feet. The spillway <br />will be sized to pass the Probable Maximum Flood and will discharge to the historic Big <br />Dry Creek drainage channel. The project also includes about 5 Yz miles of 30-inch and <br />24-inch pipeline to connect Fortune Reservoir with the rest of the Maple Grove raw water <br />system. The total cost ofthe project is estimated at $21,585,000 as summarized by major <br />project elements in Table 2. <br /> <br />Table 2. Fortune Reservoir Cost Summary <br /> <br /> <br />Land 'at reservoir. site <br />, ~roject~an,ageJne~t <br />Engineeijllg <br />Pipelin~i'.> ."., '. ' , . <br />Reservoir:aji4;~~pillway'costs, <br />TOtal " . ,. <br /> <br />$328S'QOO, <br />,,- -' )". <br />Ii) '1'.0""'0."'''"0.',. <br />~;-:::':_:;-;:~~_.>_.,'<; ;~5' _: <br />," . ' }OO,OfjO <br />'0:;:>"0, 0"0'00"0' <br />- :"~';:_::;____'Y>>',_ <br />.."... ,.l~:~OO:~OO <br />'" ""'24"5"'''.''€l€l <br />~,--, '-~",,-,'_iP>- "J," -:- .9~;V.' ,.:: <br /> <br />Impacts from the project are expected to be minimal; there are no existing structures and <br />no road relocations are needed. Environmental studies were conducted with the <br />involvement of the Colorado Department of Health and Environment (CDPHE) and the <br />Corps of Engineers. The Corps issued a letter in November 1996 stating that no federal <br />pennits wi1l be required for the project. <br /> <br />Consolidated has conducted a testing program at the site for any potential contamination <br />from the Rocky Flats nuclear facility to the north of the site. The testing indicated the <br />property was safe for use as a storage site. CDPHE issued a letter in January 1997 <br />indicating there are no health concerns with the site. <br /> <br />Final design and land and right-of-way acquisitions are completed. Construction work on <br />Highway 72 has also been completed. The remaining construction will begin in August of <br />,--this year with project completion scheduled for March 2003. ~ <br />----- <br /> <br />- <br /> <br />Financial Summarv <br /> <br />The company's financial condition appears strong at the present time. Table 3 <br />summarizes some key financial indicators based on infonnation in the Company's annual <br />reports for ,the years 1995 to 1997. All of the indicators in Table 3 are in the strong <br />category p~r the criteria used by the Division of Local Government. Cash reserves appear <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.