My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153376 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153376 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:29:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153376
Contractor Name
Granby, Town of
Contract Type
Loan
Water District
51
County
Grand
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 60203 <br />Phone: (303)866-3441 <br /> <br />STATE OF COLORI\DO <br />- <br /> <br />March 30, 1983 <br /> <br />Ki( hMd I). \..1111111 <br />Governor <br /> <br />j, William McDonald <br />Director <br /> <br />David W. Walker <br />Deputy Director <br /> <br />Western Technical Services, Inc. <br />Mr. Philip J. voegtle, President <br />Solar Plaza <br />P. O. Box 131 <br />Granby, CO 80446 <br /> <br />Re: Town of Granby <br />Water Meters and <br />Installation Contract <br /> <br />Dear Mr. voegtle: <br /> <br />We have received and reviewed the revised plans for water <br />meters and meter installation. <br /> <br />The time allowed for completion of the installation contract <br />states 150 days on 1 BP-1 and 120 days on pages A-2 (make <br />consistent). At this time we have "no comment" on the meter <br />items. There is always room for discussion on the merits of <br />either bronze or plastic housing. <br /> <br />This letter will serve as ewCB approval of the plans and <br />bidding documents. please keep us advised of plans of dates for <br />bid opening advertising, pre-construction, etc. <br /> <br />Very truly yours, <br /> <br />G. Keith Eberhardt, P. E. <br />Sr. Water Resource Engineer <br />Project planning and <br />Construction Section <br /> <br />GKE/gl <br /> <br />305 <br />l/tg <br /> <br />John R, Fetcher. Chairman - Herb~rt H. Vandemoer. Vice Chairman <br />(,M, Furneaux, Floyd l. Getz, Dale F. Grant, Roben A.Jackson. Richard W. Johnslon, Jr", Frederick V. Kroeger. David W. Robbins <br />
The URL can be used to link to this page
Your browser does not support the video tag.