Laserfiche WebLink
<br />~"r1T\ " '\{ . ~'" ,Il - . -, <br /> <br />1J11'\1 <br /> <br />'~-L~; \;(~ !"'I__ <br />., I IJI{ ,,,,I 't \ 'I \IIB I{ <br /> <br />EXHIBIT B <br /> <br />34-04-00 <br />II iJ' II< \\. I 1<01 Il'i, ,\ \1111'1< <br />, <br /> <br />I <br />J <br /> <br />FEASIBILITY REPORT <br />( ().'TI~ \("T <br /> <br />$3.000 <br /> <br />T1ilS ((lNTRACT. maul' Ihi,litLd:lI" ..f~ru~___ I<lS 7 . Ill' anu oetw<,rl! the <br />Slah' 01 (-oIIHauu lor lilt' U't' ;ul(l ht'm'lit..f lilt' Ik'pntlllt'IlI..I" Natural Resources <br />(Colorado W~ter Conseryation Board), <br />ht'rt'iu;llter r"'-.'rrl'd III a, Iht' Sl:ll('. ;llld'2 the Fruitland fl-1esa y.,'ater -COn--servancv <br />District,_B9qt.~_.lr__ CrawfO~C08l~~_,____ ---.- <br />llt'rt'ill:Jt'lnrt'tt'rredto:J'IIh','1I111ra':10f, - <br /> <br />WHEREAS. ;UUhOrJI) t'\i,r- III lilt' Lt.. ,Hid FUlHh hall' tW.'ll hudl!t'l<"d. :tppruprialeu ~nd <)theT'"-'i~<, made <br />a\l;Jil.lol.' and a ,'lIffinent lIU<"II..tllll~Jt'T't'U h;lblll't' Ih"H'lIf H'llwin, a,~ib~,' f,ur.),I:I)'rnelll Hl fUlld ,'lImher ~~, <br />ell At"coUllt ,"lllllhn..5..2...aQX. (ollll.:\l<;..1 EJH"lIlllhrallt"t' Numhrr . , 1"" <br />ABL Account Number~, Org. Unl~ II 1/-1 'I, <br />h"HEI{EAS. h'<juin'u approl:.I, ,ll':lr:Ull'.' alld c'llllflliuallUII h;t, 0.'.>11 :L.'t"onll'li,h,>u fmm Jnd \lllh <Jppropriate <br />;Jgt'll('ie~: ;H1d <br /> <br />WHEREAS, pursuant to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as amended, the State is authorized <br />to construct certain water projects for the benefit of the <br />people of the State of Colorado; and <br /> <br />WHEREAS. the Contractor has made application to the State <br />for the improvement of its existing facility. such improvement <br />of the facility is hereinafter sometime6 referred to as the <br />project: and <br /> <br />WHEREAS, the Contractor is a Water Conservancy District <br />within the State of Colorado; <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of repairing its facility in <br />accordance with a proposal for a project feasibility report <br />prepared by the conSUlting ~ngineering firm of Ute Engineering <br />and surveying Company (the consultant) and approved by the <br />State, received October 9, 1986, which proposal is attached <br />hereto as Exhibit A and made a part of this contract. <br /> <br />2. Fifteen (IS) copies of the final report called for in <br />this contract shall be furnished to the State not later than <br />April 1. 1987, unless such time is extended by mutual agreement <br />of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the Co~t~actor the sum of Three Thousand <br />Dollars ($3,000) in the manner following: <br /> <br />a. Sixty percent (60\). to wit, One Thousand Eight Hundred <br />Dollars ($1,800) of the total amount jue in two (2) monthly <br />installments of Nine Hundred Dollars ($900) each. <br />commencing on November 15. 1986. <br /> <br />b. The remaining forty percent (40\), to wit, One Thousand <br />Two Hundred Dollars ($1.200) within forty (40) days <br />following receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the consultant is six Thousand Dollars ($6.000) <br />and the Contractor shall pay the sum of Three Thousand Dollars <br />($3.000) as agreed to by letter dated September 24. 1986, which <br />is hereby attached and made a part of this contract as Exhibit <br />B; and in no event shall this payment be the liability of the <br />State of Colorado. <br /> <br />"" <br /> <br />I':.!!,> 11lt-LP;I;ll" <br />"'ExiiIBIT '"B <br />(Project Contract) <br /> <br />1863E <br /> <br />.l'J5-5liJ/--IOI4 <br />