<br />~"r1T\ " '\{ . ~'" ,Il - . -,
<br />
<br />1J11'\1
<br />
<br />'~-L~; \;(~ !"'I__
<br />., I IJI{ ,,,,I 't \ 'I \IIB I{
<br />
<br />EXHIBIT B
<br />
<br />34-04-00
<br />II iJ' II< \\. I 1<01 Il'i, ,\ \1111'1<
<br />,
<br />
<br />I
<br />J
<br />
<br />FEASIBILITY REPORT
<br />( ().'TI~ \("T
<br />
<br />$3.000
<br />
<br />T1ilS ((lNTRACT. maul' Ihi,litLd:lI" ..f~ru~___ I<lS 7 . Ill' anu oetw<,rl! the
<br />Slah' 01 (-oIIHauu lor lilt' U't' ;ul(l ht'm'lit..f lilt' Ik'pntlllt'IlI..I" Natural Resources
<br />(Colorado W~ter Conseryation Board),
<br />ht'rt'iu;llter r"'-.'rrl'd III a, Iht' Sl:ll('. ;llld'2 the Fruitland fl-1esa y.,'ater -COn--servancv
<br />District,_B9qt.~_.lr__ CrawfO~C08l~~_,____ ---.-
<br />llt'rt'ill:Jt'lnrt'tt'rredto:J'IIh','1I111ra':10f, -
<br />
<br />WHEREAS. ;UUhOrJI) t'\i,r- III lilt' Lt.. ,Hid FUlHh hall' tW.'ll hudl!t'l<"d. :tppruprialeu ~nd <)theT'"-'i~<, made
<br />a\l;Jil.lol.' and a ,'lIffinent lIU<"II..tllll~Jt'T't'U h;lblll't' Ih"H'lIf H'llwin, a,~ib~,' f,ur.),I:I)'rnelll Hl fUlld ,'lImher ~~,
<br />ell At"coUllt ,"lllllhn..5..2...aQX. (ollll.:\l<;..1 EJH"lIlllhrallt"t' Numhrr . , 1""
<br />ABL Account Number~, Org. Unl~ II 1/-1 'I,
<br />h"HEI{EAS. h'<juin'u approl:.I, ,ll':lr:Ull'.' alld c'llllflliuallUII h;t, 0.'.>11 :L.'t"onll'li,h,>u fmm Jnd \lllh <Jppropriate
<br />;Jgt'll('ie~: ;H1d
<br />
<br />WHEREAS, pursuant to the provisions of section 37-60-119.
<br />Colorado Revised Statutes. as amended, the State is authorized
<br />to construct certain water projects for the benefit of the
<br />people of the State of Colorado; and
<br />
<br />WHEREAS. the Contractor has made application to the State
<br />for the improvement of its existing facility. such improvement
<br />of the facility is hereinafter sometime6 referred to as the
<br />project: and
<br />
<br />WHEREAS, the Contractor is a Water Conservancy District
<br />within the State of Colorado;
<br />
<br />NOW THEREFORE. it is hereby agreed that:
<br />
<br />1. The Contractor shall have a feasibility report prepared
<br />and directed to the problem of repairing its facility in
<br />accordance with a proposal for a project feasibility report
<br />prepared by the conSUlting ~ngineering firm of Ute Engineering
<br />and surveying Company (the consultant) and approved by the
<br />State, received October 9, 1986, which proposal is attached
<br />hereto as Exhibit A and made a part of this contract.
<br />
<br />2. Fifteen (IS) copies of the final report called for in
<br />this contract shall be furnished to the State not later than
<br />April 1. 1987, unless such time is extended by mutual agreement
<br />of the parties hereto in writing.
<br />
<br />3. As compensation for the services of the Contractor, the
<br />State shall pay to the Co~t~actor the sum of Three Thousand
<br />Dollars ($3,000) in the manner following:
<br />
<br />a. Sixty percent (60\). to wit, One Thousand Eight Hundred
<br />Dollars ($1,800) of the total amount jue in two (2) monthly
<br />installments of Nine Hundred Dollars ($900) each.
<br />commencing on November 15. 1986.
<br />
<br />b. The remaining forty percent (40\), to wit, One Thousand
<br />Two Hundred Dollars ($1.200) within forty (40) days
<br />following receipt and acceptance of the written report
<br />specified in paragraph 2. of this contract.
<br />
<br />4. The total cost of services to be rendered for the
<br />Contractor by the consultant is six Thousand Dollars ($6.000)
<br />and the Contractor shall pay the sum of Three Thousand Dollars
<br />($3.000) as agreed to by letter dated September 24. 1986, which
<br />is hereby attached and made a part of this contract as Exhibit
<br />B; and in no event shall this payment be the liability of the
<br />State of Colorado.
<br />
<br />""
<br />
<br />I':.!!,> 11lt-LP;I;ll"
<br />"'ExiiIBIT '"B
<br />(Project Contract)
<br />
<br />1863E
<br />
<br />.l'J5-5liJ/--IOI4
<br />
|