My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00012
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:20 AM
Creation date
10/5/2006 11:29:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153542
Contractor Name
Fruitland Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.r <br /> <br />" <br /> <br />Fonn 6-I\C-'l2,.O, If( SI8SJ <br />W/PB <br />Onion Valley Dam <br />. C.:ills!;' Res,eryoi:r:' <br />~< <br /> <br />$ 1,050.55 <br />166,600.00 <br />165,549.45 <br /> <br />UU'ARTMI:.:-" r OR A.Lt::r..CY :"OL'.',HH',K <br />34-04-00 <br />CON. CT ROUTII\~(; NUMBER <br />(- 4",- <br />Reduce Encumbrance <br />from: <br />To; <br /> <br />AMENDl1ENT #l <br />PROJECT <br />CONTRACT <br />~d PromissQry No~e <br />THIS CONTRACT. madf' this 1/ day of ~...... /" 1990 ,b,' and bel ween the <br />5131t' of Colorado for the U!>e and benef'il of loe DeparuneRl of '\ Natural ResOUrces <br />(Colorado Water Conservation Board) , <br />hereinaher rt"ff'med 10 as the Stale. .and '2 the Fruitland Irrioation Comoanv. <br />Route 1, Box 34, Crawford, CO 81415. <br />hrreinaher referred 10 as the contractur IContractor. <br /> <br />q~:j1'-7 <br /> <br />, <br />WHEREAS. aUlhoril)' exiSls in thC' Law and Funds h.ave been budgeted, approprialed and otherwise made <br />:llYailable and a sufficient unencumbered balance thereof remains available for p8Vmenl in Fund ~umbf'r 4008 <br />ell Account Number 5425X. Conlracl Encumbrance NumberC153542 ; ~nd <br />ABL Account No. 14250, Org. Unit 77-77-777, <br /> <br />WHEREAS, re4uircd approv..!. clearance: and coordinatiun has been accomplished from and with appropriale <br />agrncies: and <br /> <br />WHEREAS. a contract was entered into on May 9, 1989. <br />Contract'Encumbrance No. C-153542 (the l'Origina1 Contract'I). <br />between the State and Contractor; and <br /> <br />WHEREAS. construction costs of the project were 1es6 than <br />what was originally anticipated; and <br /> <br />WHEREAS. it is now necessary to decrease the money made <br />available for the project. <br /> <br />NOW THEREFORE. ic is hereby agreed thac: <br /> <br />1. Consideration for this amendment to the Original Contract. <br />Contract Encumbrance Number C-153542. Contract Routing Number <br />89512. dated May 9, 1989. consists of the paymencs which shall <br />be made pursuant to this amendment and the promises and <br />agreements herein set forth. <br /> <br />2. This contract amendment is a supplement to the Original <br />Contract (Attachment A). which is by this reference <br />incorporated and made a part hereof; and all the terms. <br />conditions. and provisions thereof. unless specifically <br />modified herein. are to apply to this contract amendment as <br />though they were expressly rewritten. incorporated. and <br />included herein. <br /> <br />3. The only modifications. alterations. or changes in the <br />Original Contract shall be that Exhibit C shall be replaced in <br />its entirety by Attachment B and paragraphs B.15.. 0.1.. and J. <br />shall be modified to read as follows: <br /> <br />B. The Contractor agrees that it shall: <br /> <br />15. Repay to the State the total principal sum of One <br />Hundred Sixty-Eight Thousand five Hundred Forty-Nine Dollars <br />and Forty-Five Cents ($168.549.45). which includes the project <br />loan amount and the Three Thousand Dollars ($3.000) feasibility <br />report amount. together with interest at the rate of five <br />percent (5%) per annum. said repayment to be made in constant <br />annual installments of Nine Thousand Eight Hundred Twenty-Two <br />Dollars and Seventy-Five Cents ($9.822.75) each. for forty (40) <br />years. as shown in Attachment B. attached hereto and <br />incorporated by reference herein. which first installment shall <br />be due and payable on the first day of the month next <br />succeeding the month in which the State determines that the <br />project has been substantially completed. and yearly thereafter <br />until the entire principal sum shall have been paid. However. <br />in the event the Contractor does not draw funds commencing on <br />the date specified in paragraph D.l.a. below. the Obligation to <br />repay shall be postponed for the same number of months as the <br />Contractor delays in drawing funds. Said installment payments <br />shall be made payable to the Colorado Water Conservation Board. <br />payable at the offices of said Board in Denver. Colorado. <br /> <br />J9!T5Jo01-1014 <br /> <br />5 <br />f'a!!e I of_pa!!e~ <br /> <br />2032E' <br />
The URL can be used to link to this page
Your browser does not support the video tag.