My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00008
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0037X
Contractor Name
Long Draw Reservoir Project USBR 1968
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />species of trout,- Access roads, campgrounds, boat-launching ramps, <br />and sanitary facilities would be established around the reservoir by <br />the Forest Service. Under these conditions, the reservoir could be <br />expected to support about 10,000 man-days of fishing with benefits <br />of $15,000 annually. <br /> <br />To prevent destruction of fi.sh habitat by scouring and deposition of <br />silt in the streambed, future releases from the reservoir should not <br />exceed the peak historic releases from the reservoir. During the <br />construction period, care should be taken by the contractor and <br />The Water Supply and Storage Company to guard against siltation <br />of Long Draw Creek and damaging downstream fishery habitat. <br /> <br />In view of the above, it is recommended that:_ <br /> <br />I. Fish and wildlife conservation and development be <br />included as a project purpose, and specific planning <br />for fish and wildlife be included in the plan of <br />development. <br /> <br /> <br />2. Public access be provided to the reservoir except <br />for such areas as may be needed for public safety <br />and efficient operation of the project. <br /> <br />3; A grant be made to The Water Supply and Storage <br />Company for the portion of the cost of Long Draw <br />Reservoir required to provide a minimum pool not <br />lower than elevation 10,059 feet and including <br />the amount of-a cost allocation associated with <br />the fishing benefits totaling $15,000 annually. <br /> <br />4. I n order to prevent scouri ng of Long Oraw Creek <br />downstream of the reservoir; releases from Long <br />Draw Reservoir should not exceed the historic peak <br />releases from the reservoi r. <br /> <br />5. The Water Supply and Storage Company and the Con- <br />tractor take all necessary precautions during- the <br />construction period to prevent silt and other pollu- <br />tion from entering Long Draw Creek. <br /> <br />Benefits associated with 10,000 man-days of fishing on the enlarged <br />reservoir, with a minimum pool, would amount to $15,000 annually. <br /> <br />We appreciate the opportunity to assist in planning the enlarged <br />Long Draw Reservoir and cooperation extended by the officials <br />
The URL can be used to link to this page
Your browser does not support the video tag.