My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00008
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0037X
Contractor Name
Long Draw Reservoir Project USBR 1968
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />," <br /> <br /> TABLE IV-E <br /> INCREASED WATER YIELD RESULTING FROM PROJECT IMPROVEMENTS <br /> Values in Acre Feet <br /> Long Draw <br /> Grand River Ditch Reservoir <br /> Total I nc reased <br /> Intercepted Future Yield <br /> Water Diversions Diversion Due to Total <br /> Historic w/3CJ'!o w/24% Gain ""Rese rvo i r Increased <br />Year: Diversion Ditch Loss Ditch Loss w!eroiect I nc rease Yield <br />1952 21,380 30,540 23,210 1830 3200 5030 <br />1953 19,750 28,210 21,440 1690 3200 4890 <br />1954 12,740 18,200 13,830 1090 0 1090 <br />1955 16,150 23,07D 17,530 1380 0 1380 <br />1956 20,470 29,240 22,220 1750 0 1750 <br />1957 16,060 22,940 17,430 1370 4630 6000 <br />1958 13,780 19,680 14,96D 1180 3600 4780 <br />1959 18,570 26,530 20,160 1660 3200 4860 <br />1960 23,010 32,870 24,980 1970 20DO 3970 <br />1961 9,880 14,110 10,720 840 5160 6000 <br />Average J7,179 24,539 18,648 1476,', 2499~' 3975'" <br /> Note: Use 1500, 2500, and 4000 Acre Feet <br /> -I'" <br /> N <br />
The URL can be used to link to this page
Your browser does not support the video tag.