Laserfiche WebLink
<br />1.1 <br /> <br /> <br />.:Y. ;~>.;',: <br /> <br />40 <br /> <br />TABLE IV-C <br />WATER SUPPLY & STORAGE COMPANY <br />AVERAGE ANNUAL CANAL HEADGATE WATER REQUIREMENTS AND WATER SUPPLY <br />1952-1961 <br /> <br /> ac. ft. ac. ft.li rriq. acre <br />Canal Headgate Requirement 126,900 3.39 <br />Total Water Supply - Company, <br />Purchased & CBT 82,900 2.22 <br />Shortage of Total Water Supply 44,000 1.18 <br />Company Water Supply Only 65,500 I. 75 <br />Shortage of Company Water Supply 61,400 1.64 <br />Increased Yield of En 1 a rged Long <br />Draw Reservoir and Grand River Ditch 3,800 .10 <br />After Deduction of River Loss <br />