My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00008
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0037X
Contractor Name
Long Draw Reservoir Project USBR 1968
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.1 <br /> <br /> <br />.:Y. ;~>.;',: <br /> <br />40 <br /> <br />TABLE IV-C <br />WATER SUPPLY & STORAGE COMPANY <br />AVERAGE ANNUAL CANAL HEADGATE WATER REQUIREMENTS AND WATER SUPPLY <br />1952-1961 <br /> <br /> ac. ft. ac. ft.li rriq. acre <br />Canal Headgate Requirement 126,900 3.39 <br />Total Water Supply - Company, <br />Purchased & CBT 82,900 2.22 <br />Shortage of Total Water Supply 44,000 1.18 <br />Company Water Supply Only 65,500 I. 75 <br />Shortage of Company Water Supply 61,400 1.64 <br />Increased Yield of En 1 a rged Long <br />Draw Reservoir and Grand River Ditch 3,800 .10 <br />After Deduction of River Loss <br />
The URL can be used to link to this page
Your browser does not support the video tag.