My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00008
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0037X
Contractor Name
Long Draw Reservoir Project USBR 1968
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br /> <br />'.'\ <br /> <br />LEAST COST SINGLE PURPOSE ALTERNATIVES <br /> <br />.;i <br />I <br /> <br />In accordance with acceptable allocation procedures least cost single <br />purpose recreation alternatives were considered for the Long Draw Dam <br />and Reservoir. The same reservoir site was selected for comparison <br />purposes, as many of the recreation attractions are not available at <br />other locations. <br /> <br />A stable water surface is better for recreation than a fluctuating <br />water surface. Since estimated recreation benefits were based on a <br />fluctuating water surface, it was concluded that similar benefits could <br />be obtained using a smaller stable water body. The expected recreation <br />season is June 15 through September 15. By calculating an average <br />surface area for each month of the recreation season, since planned draw <br />down was available by months, an average surface area was obtained. <br /> <br />The following table summarizes the above information: <br /> <br />Multi-Purpose Project <br />Long Draw <br /> <br />Single Purpose Alternative <br />Long Draw <br />. <br /> <br /> <br />Normal water surface <br />elevation 10,103.7 <br /> <br />Capacity @ this elevation 11,000 <br /> <br />10,090 <br />6,750 <br /> <br />Surface area in acres @ <br />this elevation 340 <br /> <br />282 <br /> <br />Total cost @ this elevation $1,089,500 <br /> <br />Not available <br /> <br />Basic recreation facility <br />cost $192,800 <br /> <br />Total annual costs $8,925 <br /> <br />$192,800 <br />$8,925 <br />33,000 <br />$49,500 <br /> <br />Annual visitor use 33,000 <br />Annual recreation benefits $49,500 <br /> <br />We hope this report will meet the needs of your Bureau in completing action <br />on the Long Draw Dam and Reservoir Enlargement Project. <br /> <br />Sincerely yours, <br /> <br />'I, <br /> <br />D. S. NORDWALL <br />Regional Forester <br /> <br />By <br /> <br />a/r: C'~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.