My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00005
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:03 AM
Creation date
10/5/2006 11:29:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153402
Contractor Name
Fort Lyon Canal Company
Water District
0
County
Bent
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />level of service. In addition, the system is experiencing operational problems relating to <br />sediment deposition, weed and trash accumulation, flow measurement, seepage into and <br />out of the canal, and canal bank erosion. <br /> <br />This report investigates the need for and the work and costs involved in the <br />rehabilitation and betterment of the canal system in an effort to achieve the following <br />results: <br />I. Maintain the present level of operation of the canal system; <br />2. Increase the efficiency of canal operation and maintenance and reduce the <br />potential for future increases in the real cost of operation and maintenance of <br />the system; <br />3. Improve water distribution and management within the system. <br /> <br />It has been concluded that a comprehensive rehabilitation and betterment progrom <br />is both feasible and needed; and that postponement of the work will only serve to <br />aggravate the existing situation. The program which has been proposed is expected to <br />require about three years for completion, beginning in mid-19B4, at a total estimated <br />capital cost of about $2,700,000. It is anticipated that the project will be partially <br />funded through the Colorado Water Conservation Board Construction Fund, with the <br />remaining funding being a combination of special assessments to the Canal Company <br />stockholders, and other outside sources. A potential financing plan has been developed <br />using funding from the Colorado Water Conservation Board, the Wichita Bank of <br />Cooperatives, and the Canal Company. This financing plan indicates that the proposed <br />work can be completed as recommended at an average annual cost to the stockholders of <br />about $2.00 per share over a period of 35 years. <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.