Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />minor surface corrosion and leakage. The disrepair of the handrailing and lack of covers <br />over the gate boys present minor safety hazards. Power operation of the gate was <br />considered but rejected due to the relative inaccessability of the gates. The possibility <br />of constructing a sluiceway at this structure to reduce the sediment entering the conal <br />has been considered and is discussed on Page 48. <br /> <br />Rehabilitation of this structure is relatively minor and would involve the following <br />work: <br />I. Reconditioning the steel radial gates; I <br />2. Repairing or replacing defective handrailing and installing new handrailing <br />where needed; <br />3. Installing galvanized steel grating over the gate boys. <br />The estimated capital cost for this work is approximately $15,800, as outlined in <br />Table B-1. <br /> <br />Lower Diversion Dam, Fort Lyon Canol. This structure is approximately one-half <br />mile downstream from the upper diversion dam and allows diversion of water from the <br />diversion channel into the Fort Lyon Canol. The structure includes 0 diversion dam <br />across the diversion channel with 0 single boy control gate, and 0 seven-boy regulator <br />structure across the main canal (see Figure 7 and Photograph 2). <br /> <br />This structure is also in relatively goad condition, with only minor spoiling of the <br />concrete and some surface corrosion and leakage of the steel radial gates in the canal <br />regulator structure. A new steel radial gate was recently installed in the diversion dam <br />control structure, and is presently operated with on electric drum hoist. The timber slide <br />gate located in the center bay of the canal regulator needs repair to prevent leakage. <br />For safety reasons, the handrailing should be repaired or replaced, and grating should be <br />installed over the gate boys. Due to the critical function of this structure, and the <br />reported difficulty of operating the radial gates, power gate hoists ore recommended for <br />the six radial gates in the canol regulator. In order to reduce the amount of sediment <br />entering the conal, the feasibility of constructing 0 sluiceway at this location has been <br />investigated and is discussed on Page 48. <br /> <br />Rehabilitation of this structure involves the following items: <br /> <br />I Reconditioning of the steel gates in this report includes cleaning, sandblasting and <br />pointing the gates; replocing the seals; and lubricating 011 moving parts. <br /> <br />20 <br />