My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153742 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153742 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2011 3:12:13 PM
Creation date
10/5/2006 11:29:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153742
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />......... ... <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 8b <br />November 9, 1993 <br /> <br />3 <br /> <br />ACTION TAKEN BY lHE CWCB BOARD <br /> <br />On November 9, 1993 the CWCB Board took the following action: <br /> <br />1. Approved AN EMERGENCY WAN FROM lHE CONSTRUCTION FUND IN <br />AMOUNT OF $75,000 ( 3.5% FOR 30 YEARS) FOR THE BEAVER PARK <br />WATER COMPANY, FOR a Feasibility Study and DESIGN OF EMERGENCY <br />REPAIRS TO lHE BRUSH HOLLOW DAM, and <br /> <br />2. Approved A LOAN FROM lHE CONSTRUCTION FUND IN AMOUNT OF <br />$750,000 ( 3.5% FOR 30 YEARS) FOR lHE BEAVER PARK WATER <br />COMPANY, FOR construction OF EMERGENCY REPAIRS TO lHE BRUSH <br />HOLLOW DAM, and <br /> <br />3. Required THAT LOAN APPROVAL BE CONTINGENT UPON <br />EV ALUATION OFlHE COMPANY'S FINANCIAL CONDITION AND ABIUTY <br />TO PAY. <br /> <br />Attachments <br />C:\wp51\8bU9,cwc <br />
The URL can be used to link to this page
Your browser does not support the video tag.