My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153742 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153742 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2011 3:12:13 PM
Creation date
10/5/2006 11:29:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153742
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-i': '. ~ <br /> <br />. <br /> <br />. CWCB Emergency Repair Account Loan Application <br />Revised June 8, 1993 <br /> <br />. <br /> <br />~ <br /> <br />5. Please list the names and addresses of 3I1Y technical consultants retained to represent you <br />or to conduct investigations for the proposed repair: <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />GEl, Steve Jameison, 5660 Greenwood, Plaza Blvd., Suite 202, <br />Englewood, CO 80111 303-779-5565 <br /> <br />6. List any studies or other investigations which have been completed or are now in <br /> <br /> <br />progress for the proposed emergency repair project. (Please submit one copy of each <br /> <br /> <br />completed study with this application): <br /> <br />Attachment C is a copy of the proposal for these services - the emer~p.ncy <br /> <br />grant~or- loan is needed to proceed. <br /> <br />7. What is the estimated cost of the Iepair project? Please include estimated Engineering <br />costs, and estimated Construction costs, if known: <br />Estimated Engineering Costs : $ 65,000 <br />Estimated Construction Costs : $300,000 (stability problem) <br />135,000 (deficient spillway) <br />Estimated Total Cost : $500,000 <br /> <br />Part D. - Project Sponsor Financial Infonnlltion <br /> <br />Because the CWCB Construction Fund Emergency Account is a revolving fund, it is important <br />that the project sponsor have the financial capacity to Iepay any loans made by the CWCB, The <br />following information is requested to assist the CWCB in a preliminary assessment of the <br />applicant's financial capacity. (It is also requested that the project sponsor submit copies of the <br />two most recent annual reports, financial statements, corporate reports or other current <br />documentation of financial condition and operations. This information may be submitted after <br />initial review of your application by the CWCB). <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.