My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153598 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153598 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:56 AM
Creation date
10/5/2006 11:29:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153598
Contractor Name
Lookout Mountain Water District
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(:':?-. ."''", <br />\'\:.9 ~;fh1 <br /> <br />,<-~. <br /> <br />:.;) ...:7',.'" <br /> <br />paid or accrued, for operation, maintenance and repair of <br /> <br /> <br />the System as may be determined by the Board, and the term <br /> <br /> <br />may include at the District's option, except as limited by <br /> <br /> <br />contract or otherwise limited by law, without limiting the <br /> <br /> <br />generality of the foregoing: <br /> <br /> <br />(a) Legal and overhead expenses of the District <br /> <br /> <br />directly related and reasonably allocable to the <br /> <br /> <br />administration of the System; <br /> <br /> <br />(b) Fidelity bond and insurance premiums <br /> <br /> <br />appertaining to the System or a reasonable allocable <br /> <br /> <br />share of a premium of any blanket bond or policy <br /> <br /> <br />pertaining to the System; <br /> <br /> <br />(c) Contractual services, professional services, <br /> <br />salaries, administrative expenses, and costs of labor <br /> <br /> <br />appertaining to the System; <br /> <br />(d) The costs incurred in the collection of all <br /> <br /> <br />or any part of the Gross System Revenues; <br /> <br /> <br />"Operation and Maintenance Expenses" does not include: <br /> <br /> <br />(i) Any allowance for depreciation; <br /> <br />( ii) <br /> <br />Any costs of System renewals or <br /> <br />replacements, reconstruction, improvements, <br />extensions, or betterments; <br /> <br />(Hi) <br /> <br />Any accumulation of reserves for <br /> <br />capital replacements; <br /> <br />( iv) <br /> <br />Any reserves for operation, <br /> <br />maintenance, or repair of the System; <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.