Laserfiche WebLink
<br />l <br /> <br />) <br /> <br />, <br /> <br />-~ <br /> <br />this proceeding and over all who have standing to <br />appear as parties, whether they have appeared or <br />not. <br /> <br />b. Statements of OpPosition: A St.atement .of <br />Opposition was filed by the City and County of <br />Denver acting by and through its Board of Water <br />Commissioners; by the Middle Park Water Conservancy <br />District; . and by the Town of Fraser.. No other <br />Statements of Opposition have been filed and the <br />time for filing such statements has now expired. <br /> <br />c. Summarv of Consultation: On April 19, 1991, <br />the Division Engineer iorWater Division No. 5 <br />submitted a Summary of Consultation stating that <br />the Application appears to be adequate and <br />recommending that the Application should be issued <br />by the Referee as a ruling. The Referee has given <br />this recommendation due consideration. <br /> <br />d. Resolution of Statements of .Opposition: All <br />parties filing Statement~ of Opposition have either <br />reached Stipulations with CWCB, withdrawn their <br />Statement of Opposition, or otherwise approved the <br />terms contained herein. <br /> <br />3. Reauested Water Riqht: The CWCB appropriated the <br />Instream Flow more fully described as follows: <br /> <br />a. Source: The source of the water is St. Louis <br />Creek. <br /> <br />b. Location: <br /> <br />Legal description of the stream segment through <br />which an instream flow is claimed: The natural <br />stream channel from the confluence with King Creek <br />at latitude 39054'52" North and longitude <br />105052;27" West as the upstream terminus and <br />extending to the Tyron ditch diversion in NW/4NE/4 <br />S19 TIS R75W 6PM as the downstream terminus, being <br />a distance of approximately 4.2 miles. This <br />segment can be located on the Fraser U.S.G.S. <br />. quadrangle. <br /> <br />Administration: For the stream segments in an <br />unsurveyed area, the Division Engineer has <br />determined for administrative purposes that the <br />approximate legal description of the instream flow <br />terminus as protracted irom U.S.G.S_ mapping is as <br />follows: upstream terminus in the NW/4 SE/4 S34 <br />TlS R76W 6PM. <br />