My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP01152
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1001-2000
>
ISFAPP01152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:05:26 AM
Creation date
10/5/2006 10:21:19 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
98CW0231
Stream Name
Magdalene Gulch
Watershed
Taylor River
Water Division
4
Water District
59
County
Gunnison
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />No 98CW231 <br />Colorado Water Cons. Board <br /> <br />claimed. <br /> <br />a. The natural stream channel from headwaters in the vicinity of latitude <br />38054' 01" N and longitude 106021' 53" Was the upstream terminus and <br />extending to confluence Texas Creek at latitude 380 53' 04" N and <br />longitude 106020' 54" Was the downstream terminus, being a distance of <br />approximately 2 miles. This segment can be located on the Mount <br />Harvard U.S.O.S. quadrangle. See Exhibit A. <br /> <br />b. Administration: for the stream segments in an unsurveyed area, the <br />Division Engineer has determined for administrative purposes that the <br />approximate legal description of the instream flow termini as protracted <br />from U.S.O.S. and/or U.S.F.S. mapping is as follows: downstream <br />terminus in the NE Y. NE Y. Sec. 32, T13S, R80W, 6th P.M. <br /> <br />5. Use of water: <br /> <br />To preserve the natural environment to a reasonable degree <br /> <br />6. Date of initiation of appropriation: <br /> <br />May 11, 1998 <br /> <br />7. The water was first applied to the above beneficial use on May 11, 1998, <br />by action of the Colorado Water Conservation Board under the provision <br />ofC.R.S. 9 9 37-92-102(3),37-92-103(3), (4), (10). <br /> <br />8. Amount of water claimed (ABSOLUTE): Instream flow of 1.75 c.f.s. <br />(May 1 - July 31); 0.75 c.f.s. (August I - September 30); 0.4 c.f.s. <br />(October 1- March 31); 0.75 c.f.s. (April 1- April 30). <br /> <br />THE WATER REFEREE RULES: <br /> <br />The application is granted and a decree in the amount of (ABSOLUTE) <br />Instream flow of 1.75 c.f.s. (May 1- July 31); 0.75 c.f.s. (August I - September 30); <br />0.4 c.f.s. (October I-March 31); 0.75 c.f.s. (April 1- April 30) is hereby entered to <br />preserve the natural environment to a reasonable degree through the upstream and <br />downstream points as described in paragraph 4 above. The appropriation date for this <br />~ <br />water right is May 11, 1998. <br /> <br />The priority herein awarded was filed in the water court in the year of 1998 <br />and shall be junior to all priorities filed in previous years. As between all rights filed <br />in the same calendar year, priorities shall be determined by historical date of <br />appropriation and not affected by the date of entry of ruling. The Applicant shall <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.