Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />90CW303 <br />Water Div. 5 <br /> <br />this proceeding and over all who have standing to <br />appear as parties, whether they have appeared or <br />not. <br /> <br />b. Statements of Opposition: A Statement of <br />Opposition was filed by the City and County of <br />Denver, acting by and through its Board of Water <br />Commissioners; and by the Middle Park Water <br />Conservancy District. No other Statements of <br />Opposition have been filed and the time for filing <br />such statements has now expired. <br /> <br />c. Summarv of Consultation: On April 19, 1991, <br />the Division Engineer for Water Division No. 5 <br />submitted a Summary of Consultation stating that <br />the Application appears to be adequate and <br />recommending that the Application should be <br />issued by the Referee as a ruling. The Referee has <br />given this recommendation due consideration. <br /> <br />d. Resolution of Statements of Opposition: All <br />parties filing Statements of Opposition have either <br />reached Stipulations with CWCB, withdrawn their <br />Statement of Opposition, or otherwise approved the <br />terms contained herein. <br /> <br />3. Reauested Water Riaht: The CWCB appropriated the <br />Instream Flow more fully described as follows: <br /> <br />a. Source: <br />Creek. <br /> <br />The source of the water is St. Louis <br /> <br />b. Location: <br /> <br />Legal description of the stream segment through <br />which an instream flow is claimed: The natural <br />stream channel from the headwaters in the vicinity <br />of latitude 39048'27" North and longitude <br />105057'20" West as the upstream terminus and <br />extending to the Denver Water Board diversion at <br />latitude 39051'09" North and longitude 105054'34" <br />West as the downstream terminus, being a distance <br />of approximately 4.7 miles. This segment can be <br />located on the Byers Peak U.S.G.S. quadrangle. <br /> <br />Administration: For the stream segments in an <br />unsurveyed area, the Division Engineer has <br />determined for administrative purposes that the <br />approximate legal description of the instream flow <br />termini as protracted from U.S.G.S. mapping are as <br />follows: upstream terminus in the SW/4 NE/4 S12 T3S <br />