My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP01054
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1001-2000
>
ISFAPP01054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:05:17 AM
Creation date
10/5/2006 10:21:01 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
95CW0257
Stream Name
Jasper Creek
Watershed
Middle Boulder Creek
Water Division
1
Water District
6
County
Boulder
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . . <br />. <br /> <br />1. <br /> <br />The name and address of the Applicant is: <br /> <br />, No, 9S,CW,Z57 <br />:1. . ~ <br />. " 1 <br />I <br />, <br /> <br />, <br />l <br /> <br />Colorado Water Conservation Board' <br />1313 Sherman Street, Suite 721 <br />Denver, Colorado 80203 <br />(303) 866-3441 <br /> <br />........ ..". <br /> <br />, <br />, 'J <br /> <br />2. The name of the stre,am involved: <br /> <br />Jasper Creek (instream flow). <br /> <br />3. The source of the water is: <br /> <br />Jasper Creek, tributary to the Boulder Creek. <br /> <br />4. <br />claimed. <br /> <br />Legal description of the stream segment through which an instream flow is <br /> <br />The natural stream chat)l1el from the headwaters at latitude 390 57' <br />55"N and longitude 105040' 55"W as the upstream terminus and <br />extending to confluence of South Fork, Middle Boulder Creek at <br />latitude 390 57' 16"N and longitude 105036' 58"W as the <br />downstream terminus, being a distance of approximately 4.5 miles. <br />This segment can be located on the East Portal and Nederland <br />U.S.G.S. quadrangles and is depicted on Exhibit A. <br /> <br />For the stream segments in an unsurveyed area, the Division <br />Engineer has determined for administrative purposes that the <br />approximate legal descriptioI:j of th~ instream flow termini as <br />protracted from U.S.G.S. and/or U.s.F.S. mapping is as Jollows: <br />upstream terminus in the NE/4 NE/4, Sec. 17, TIS, R74W, 6th <br />P.M.; downstream terminus in the SW/4 SE/4, Sec. 13, TIS, <br />R74W, 6th P.M. <br /> <br />5. Use of the water: <br /> <br />Instream flow to preserve the natural environment to a reasonable degree. <br /> <br />" <br /> <br />6. Date of initiation of appropriation: <br /> <br />" <br />.,\ <br /> <br />/\ <br /> <br />2 coN'. <br /> <br />" <br />, " <br />
The URL can be used to link to this page
Your browser does not support the video tag.