Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />The Upper Gunnison <br />timely filed a statement <br />drawn said opposition. <br /> <br />River Water Conservancy District also <br />of opposition and has subsequently with- <br /> <br />All matters contained in the application have been reviewed <br />and testimony taken where such testimony is necessary and the <br />court finds that the statements contained in the application are <br />true and that applicant is entitled to the water right requested <br />in the application. <br /> <br />IT IS THEREFORE ORDERED AND DECREED: <br /> <br />Name and address of claimant: <br /> <br />The Colorado water Conservation Board <br />1313 Sherman Street, Room 823 <br />Denver, CO 80203 <br /> <br />WATER RIGHT <br /> <br />Name of natural stream: Tomichi Creek <br /> <br />Location: A. Legal description of beginning and end <br />points of minimum stream flow claimed: The natural stream chan- <br />nel from the confluence with Triano Creek at lat. 38 deg. <br />29'29"N, long. 106 deg. 25'23"W as the upstream terminus and the <br />confluence with Quartz Creek in the NW/4 NW/4 S23 T49N R2E NMPM <br />as the downstream terminus being a distance of approximately 34.4 <br />miles. This segment can be located on the Gunnison County <br />(1:50,000), Doy1eville, Houston, Gulch, Parlin, and Sargents <br />U.S.G.S. quadrangle(s). <br /> <br />B. The stream segment referred to in paragraph 3(A) <br />above has been subdivided as follows for purposes of identifying <br />the flow amounts claimed as to each segment: <br /> <br />i. (segment 1) the natural stream channel from the <br />confluence with Triano Creek at lat. 38 deg. 29'29"N, long. 106 <br />deg. 25'23"W as the upstream terminus and the confluence with <br />Marshall Creek in the SW/4 NW/4 S21 T48N R5E NMPM as the down- <br />stream terminus, being a distance of approximately 9.2 miles. <br /> <br />-2- <br />