Laserfiche WebLink
<br />79CW169 <br /> <br />sl <br />, (t <br />fJ~P: <br />~,Xl <br /> <br />per second of time during the summer months and 3.0 cubic feet of <br />water per second of time during the winter months. <br /> <br />9. The water was first applied to the above beneficial use on <br />May 18, 1979, by action of the Colorado Water Conservation Board under <br />the provisions of C.R.S. 1973, 37-92-102 (3), 37-92-103 (3), (4), and <br />(10) . <br /> <br />10. This appropriation is made under the provisions of C.R.S. <br />1973, 37-92-102(3), 37-92-103(3), (4) and (10), known as Senate Bill <br />97, signed into law April 23, 1973. <br /> <br />11. A statement of opposition was timely filed by the United <br />States of America, and as a result, on October 31, 1979, the application <br />was re-referred by the Water Referee to the Water Judge for Water <br />Division No.5. <br /> <br />12. On October 16, 1979, the statement of opposition of the <br />United States of America was effectively withdrawn as a result of <br />stipulation between the parties involved, the pertinent parts of which <br />are included in this RUling of Referee. As a result, the application <br />has been again referred to the Water Referee by the Water Judge for <br />Water Division No.5. <br /> <br />The Referee does therefore conclude that the above entitled <br /> <br />application should be granted and that 6.0 cubic feet of water per <br /> <br /> <br />second of time during the"summer months and 3.0 cubic feet of water <br /> <br />per second of time during the winter months are hereby awarded for <br /> <br />the purpose of maintaining a minimum stream flow as required to <br /> <br />preserve the natural environment to a reasonable degree on the <br /> <br />Williams Fork River between the beginning and end points as described <br /> <br />in paragraph 5 above, with appropriation date of. the 18th day of May, <br /> <br />1979, absolutely and unconditionally;. subject, however, to the <br /> <br />following stipulated agreement; <br /> <br />a. Applicant's rights are subject to all senior rights of <br />the United States of America in the subject source, <br />including properly decreed reserved rights, as are now or <br />will hereafter be determined by law. . <br />b. Applicant shall apply for any special use permits or <br />rights-af-way, as the case may be, if the same are required. <br />by law for the use of public resources contemplated by the <br />subject application and shall abide by the conditions set <br />forth therein; <br /> <br />and subject to all earlier priority rights of others and to the <br /> <br />integration and tabulation by the Division Engineer of such.priorities <br /> <br />and changes of rights in accordance with law; and provided further <br />that the applicant herein will construct and maintain at its expense <br />a suitable measuring device or g~uging station as approved by the <br />State Engineer or his representative for the purpose of administering <br />this water right in priority as required by laww <br />