Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Legal description of the stream segment through which an <br />instream flow is claimed. Segment 1: The natural stream <br />channel from confluence of Monte Cristo and Bemrose Creeks <br />at lat. 39 deg. 23'13"N, long, 106 deg, 03'08"W as the <br />upstream terminus and extending to the Highway 9 Bridge <br />near the confluence of Fredonia Gulch at lat. 39 deg, <br />24'55"N, long, 106 deg. 02'4l"W as the downstream terminus, <br />being a distance of approximately 2.2 miles, se9ment 2: <br />The natural stream channel from the Highway 9 Br1dge near <br />the confluence of Fredonia Gulch at lat, 39 deg. 24'55"N, <br />long, 106 deg. 02'4l"W as the upstream terminus and extend- <br />ing to the upstream end of the highwater line of Goose Pas- <br />ture Tarn at full decreed capacity at lat, 39 deg, <br />26'56"N, log. 106 deg, 02'OO"W as the downstream terminus, <br />being a distance of 2,7 miles. These segments can be <br />located on the Breckenridge and Frisco U,S,G.S, <br />quadrangle(s). <br /> <br />For administrative purposes only, the Division Engineer for <br />Water Division 5 has translated the segments thus <br />described into approximate protracted section, township, <br />and range locations from U.S.G,S, mapping as follows: <br />Segment 1: Upstream terminus in the NE/4 NE/4 Sl TaS R78W <br />6th P,M.: more specifically at a point whence the SE corner <br />of said section bears N03 30W a distance of 4,000 ft,: <br />downstream terminus in SW/4 NW/4 S30 T7S R77W 6th P,M, <br />Segment 2: upstream terminus in SW/4 NW/4 S30 T7S R77W 6th <br />P,M.: downstream terminus NE/4 NE/4 S8 T7S R77W 6th P,M., <br />specifically, the inlet to Goose Pasture Tar~. <br /> <br />c, (1) Date of initiation of appropriation: March 14, 1986. <br /> <br />(2) Date water applied to beneficial use: Water was first <br />applied to beneficial use on March 14, 1986, pursuant to S <br />37-92-103(4), C.R,S, (1973). <br /> <br />(3) How appropriation was initiated: By applicant's <br />approval of its staff's final recommendations at a regu- <br />larly scheduled meeting, subsequent to having requested and <br />considered recommendations from the Division of Wildlife, <br />and the Division of Parks and Outdoor Recreation, <br /> <br />d, Amount of water claimed: <br /> <br />Segment 1: 2 c.f.s. (May 1 through Sept, 30) , 1 c.f.s. <br />(Oct, 1 through Apr. 30), absolute, <br />Segment 2: 5 c.Ls, (May 1 through Sept. 30) , 2 c.f.s. <br />(Oct, 1 through Apr. 30), absolute, <br /> -16- <br />