Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />90CW318 <br />Water Div. 5 <br /> <br />approximate legal description o~ the instream flow <br />terminus as protracted from U.S.G.S. mapping is as <br />follows: upstream terminus in the NW/4 NE/4 S19 <br />T2S R75W 6PM. <br /> <br />c. Amount of water appropriated: <br />ABSOLUTE (May 15 September 15); <br />ABSOLUTE (September 16 - May 14) . <br /> <br />6.0 <br />3.0 <br /> <br />c.f.s. <br />c.f.s. <br /> <br />d. Appropriation date: November 27, 1990. The <br />appropriation was initiated and water first put to <br />beneficial use on Nov~mber 27, 1990, by action of <br />the Colorado Water Conservation Board under ss 37- <br />92 -102 (3), 103 (3), 103 (4), and 103 (10), C . R. S . <br />(1990 Repl. Vol. 15). <br /> <br />e. Use of Water: For Instream Flows to preserve <br />the natural environment to a reasonable degree. <br /> <br />4. Proposed terms and conditions: <br /> <br />a. Denver is the owner and user of senior water <br />rights and owns and maintains diversion structures <br />within the instream flow segment that is the <br />subject of this application. Denver's water rights <br />are both absolute and conditional. Denver diverts <br />water from Vasquez C:t'eek, either directly or by <br />exchange, under decrees entered in Civil Action <br />Nos. 657 and 1430. ~he CWCB recognizes and will <br />not contest that these water rights are senior to <br />its instream flow appropriation. Nor will the CWCB <br />oppose the perfectioIl of, or application for a <br />finding of diligence for, these senior conditional <br />water rights. Furthe:t, the CWCB will not claim or <br />assert injury to its water rights from Denver's <br />operation of its senior rights at the existing <br />points of diversion located on this instream flow <br />segment. Moreover, the CWCB will not prevent <br />Denver's operation of its senior rights at the <br />existing points of diversion located on this <br />instream flow segment. "Denver's operation" shall <br />include any operations, maintenance, repairs, or <br />replacements of the diversion structures and their <br />appurtenant structures, as determined necessary by <br />Denver. <br /> <br />b. Denver holds a conditional storage right within <br />the instream flow segment that is the subject of <br />this application. The CWCB recognizes Denver's <br />conditional storage right, as decreed in civil <br />Action No. 657 and will not oppose the construction <br />