Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />90CW304 <br />Water Div, 5 <br /> <br />this proceeding and over all who have standing to <br />appear as parties, whether they have appeared or <br />not. <br /> <br />b, Statements of Ooposition: A Statement of <br />Opposition was filed by the Town of Fraser; and by <br />the City and County of Denver, acting by and <br />through its Board of Water Commissioners, No other <br />Statements of Opposition have been filed and the <br />time for filing such statements has now expired, <br /> <br />c. Summary of Consultation: On April 19, 1991, <br />the Division Enginee:r:- for Water Division No, 5 <br />submitted a Summary of Consultation stating that <br />the Application appears to be adequate and <br />recommending that the Application should be issued <br />by the Referee as a ruling, The Referee has given <br />this recommendation due consideration, <br /> <br />d, Resolution of Statements of Opposition: All <br />parties filing Statements of Opposition have either <br />reached Stipulations with CWCB, withdrawn their <br />Statement of Opposition, or otherwise approved the <br />terms contained herein, <br /> <br />3. Requested Water Riaht: The CWCB appropriated the <br />Instream Flow more fully described as follows: <br /> <br />a, Source: <br />Creek, <br /> <br />The source of the water is St, Louis <br /> <br />b, Location: <br /> <br />Legal description of the stream segment through <br />which an instream flow is claimed: The natural <br />stream channel from the Denver Water Board <br />diversion at latitude 39051'09" North and longitude <br />105054'34" West as the upstream terminus and <br />extending to the confluence with East St, Louis <br />Creek at latitude 39053'50" North and longitude <br />105052'55" West as the downstream terminus, being a <br />distance of approximately 3,7 miles. This segment <br />can be located on the Byers Peak and Bottle Pass <br />U,S,G,S, quadrangles, <br /> <br />Administration: For the stream segments in an <br />unsurveyed area, the Division Engineer has <br />determined for administrative purposes that the <br />approximate legal description of the instream flow <br />termini as protracted from U,S,G,S, mapping are as <br />follows: upstream terminus in the NE/4 NE/4 S29 <br />