Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />Case <br /> <br />~~ <br /> <br />#87CW269 <br />Creek <br /> <br />Acme Creek instream flow. <br /> <br />2. The legal description of the structure: <br /> <br />The natural stream channel from headwaters in the NE/4 NE/4 <br />sec. 22, TIIN, R74W, 6th P.M. as the upstream terminus and <br />extending to the confluence with Sh~ep Creek in the SW/4 <br />SE/4 sec. 12, TIIN, R74W, 6th P.M. as the downstream <br />terminus, being a distance of approximately 2.2 miles. <br />This segment can be located on the Eaton Reservoir U.S.G.S. <br />quadrangles. <br /> <br />3. The source of water: <br /> <br />Acme Creek <br /> <br />4. The date of appropriation: <br />December 11, 1987 <br /> <br />5. The amount of water claimed: <br /> <br />Instream flow of 0.5 c.f.s. <br /> <br />6. The use of the water: <br /> <br />To maintain such minimum flows as are required to preserve <br />the natural environment to a reasonable degree pursuant to <br />sections 37-92-102 and 103, C.R.S. (1973 & 1987 Supp.). No <br />diversion of the water right herein will be made from the <br />natural stream channel. <br /> <br />7. <br />ing devices <br />may require <br /> <br />The applicant shall install and maintain such measur- <br />and maintain such records as the Division Engineer <br />for administration of this right. <br /> <br />8. The priority herein awarded, said Acme Creek instream <br />flow, was filed in the water court in the year of 1987 and shall <br />be administered as having been filed in that year; and shall be <br />junior to all priorities filed in previous years. As between all <br />rights filed in the same calendar year, priorities shall be <br />determined by historical dates of appropriation and not affected <br />by the date of entry of ruling. <br /> <br />-2- <br />