Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />B9CW210 <br />CWCB <br />Sheep Creek <br /> <br />, . <br /> <br />Sheell- Creek instream flow. <br /> <br />-: '-., ~ <br /> <br />2~~:Theleqal description of the structure: <br /> <br />The natural stream channel from the confluence with an <br />unnamed tributary in the NE/4, SE/4. Sec. 35, T7N, R72W, <br />6th P.M. as the upstream terminus and extending to the con- <br />fluence with Buckhorn Creek in the NW/4, SE/4, Sec. 16, <br />T7N, R7lW, 6th P.M. as the downstream terminus, being a <br />distance of approximately 6.7 miles. This segment can be <br />located on the Buckhorn Mountain and Crystal Mountain <br />U.S.G.S. quadrangles. <br /> <br />3. The source of water: <br /> <br />Sheep Creek <br />4. The date of appropriation: <br />November 14, 1989 <br /> <br />5. The amount of water claimed: <br /> <br />l.O c.f.s. (April 1 - October 3l); 0.5 c.f.s. (November I - <br />March 31) <br /> <br />6. The use of the water: <br /> <br />To maintain such minimum flows as are required to preserve <br />the natural environment to a reasonable degree pursuant to <br />sections 37-92-l02 and l03, C.R.S. (1973 & 1989 Supp.), No <br />diversion of the water right herein will be made from the <br />natural stream channel. <br /> <br />7. <br />ing devices <br />may require <br /> <br />The applicant shall install and maintain such measur- <br />and maintain such records as the Division Engineer <br />for administration of this right. <br /> <br />8. The priority herein awarded, said Sheep Creek in- <br />streaa fI~.. ~w~a filed in the water court in the year of 1989 and <br />shall be-~lJistered as having been filed in that year; and <br />shall be'~r to all priorities filed in previous years. As <br />between a ~ilghts filed in the same calendar year, priorities <br />shall be determined by historical dates of appropriation and not <br /> <br />-2- <br />