Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />..........~o;;; J.'iu. OoflL.WO'"tO <br />Elk Creek <br />CWCB <br /> <br />Elk Creek Minimum Flow <br /> <br />2. The legal description of the structure: <br /> <br />The natural stream channel from headwaters in the vicinity <br />of lat. 39 deg. 32'47"N, long. 105 deg. 33'34"W as the <br />upstream terminus and extending to the confluence with the <br />North Fork South Platte River in the NE/4 SE/4 Sec. 27 T7S <br />R71W 6th P.M. as the downstream terminus, being a distance <br />of approximately 20.6 miles. This segment can be located <br />on the Harris Park, Meridian Hill, Bailey and Pine U.S.G.S. <br />quadrangle(s). <br /> <br />For administrative purposes only, the Division Engineer has <br />translated these legal descriptions of the stream termini into <br />approximate protracted section, township, and range location from <br />U.S.G.S. mapping as follows: Upstream terminus in Sec. 9 T6S <br />R73W 6th P.M. <br /> <br />3. The source of water: <br /> <br />Elk Creek <br /> <br />4. The/date of appropriation: <br /> <br />January 6, 1984 <br /> <br />5. The amount of water claimed: <br /> <br />5.0 c.f.s. ~bsolute <br /> <br />6. The use of the water: <br /> <br />To maintain such minimum flows as are required to preserve <br />the natural environment to a reasonable degree pursuant to <br />sections 37-92-102 and 103, C.R.S. (1973 & 1986 Supp.). No <br />diversion of the water right herein will be made from the <br />natural stream channel. <br /> <br />7. <br />ing devices <br />may require <br /> <br />The applicant shall install and maintain such measur- <br />and maintain such records as the Division Engineer <br />for administration of this right. <br /> <br />8. The priority herein awarded said Elk Creek (instream <br /> <br />-2- <br />