My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00497
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:04:21 AM
Creation date
10/5/2006 10:19:20 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
84CW0402
Stream Name
Trout Creek
Watershed
North Fork Gunnison River
Water Division
4
Water District
40
County
Gunnison
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br /><0. <br /> <br />. <br /> <br />. <br /> <br />IT IS THEREFORE ORDERED AND DECREED: <br /> <br />Name and address of claimant: <br /> <br />The Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />WATER RIGHT <br /> <br />Name of natural stream: Trout Creek. <br /> <br />Location: Legal description of beginning and end <br />points of minimum stream flow claimed: The natural stream <br />channel from headwaters in the vicinity of lat. 38 deg. <br />51'28"N, long. 107 deg. 13'19"W as the upstream terminus and <br />the confluence with Ruby Anthracite Creek at lat. 38 deg. <br />55'25"N, long. 107 deg. 12'18"W as the downstream terminus <br />being a distance of approximately 5.1 miles. This segment <br />can be located on the Anthracite Range, Marcellina Mountain <br />U.S,G.S. quadrangle(s). <br /> <br />Administration: For the stream segment(s) in an <br />unsurveyed area, the division engineer has determined for <br />administrative purposes that the approximate legal descrip- <br />tion of the instream flow termini as protracted from <br />U.S.F.S. Planimetric (1:31,680) mapping is as follows: <br />Upstream terminus in the NE/4 NE/4 NE/4S9 T14S R88W 6th PM <br />approximately 500 ft. West of East Line; 330 ft. South of <br />North Line; downstream terminus in the NW/4 NE/4 SE/4 S15 <br />T13S R89W 6th PM approximately 1100 ft. West of East Line; <br />2360 ft. North of South Line. <br /> <br />Priority date: May 4, 1984 provided, however, that <br />this right shall be junior to all priorities awarded in <br />cases filed prior to 1984, and otherwise junior as provided <br />in section 37-92-306, C.R.S. (1973). <br /> <br />Instream flow amount: 1.0 c.f.s. absolute <br /> <br />Use of water: To maintain such minimum flows as are <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.