My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00419
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:04:13 AM
Creation date
10/5/2006 10:19:03 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
98CW0219
Stream Name
Powderhorn Creek
Watershed
Cebolla Creek
Water Division
4
Water District
62
County
Gunnison
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br /> <br />No 98CW219 <br />Colorado Water Cons. Board <br /> <br />claimed. <br /> <br />a. The natural stream channel from confluence Mid and East Forks <br />Powderhorn Creek SW 1/4 NW 1/4 Sec. 21, T46N, R2W, NMPM as the <br />upstream terminus and extending to confluence West Fork Powderhom <br />Creek NE 1/4 NW 1/4 Sec, 17, T46N, R2W, NMPM at latitude as the <br />downstream terminus, being a distance of approximately 1,8 miles. This <br />segment can be located on the Rudolph Hill U.S,G,S. quadrangles, See <br />Exhibit A. <br /> <br />5. Use of water: <br /> <br />To preserve the natural environment to a reasonable degree, <br /> <br />6, Date of initiation of appropriation: <br /> <br />May 11, 1998 <br /> <br />7, The water was first applied to the above beneficial use on May II, 1998, <br />by action of the Colorado Water Conservation Board under the provision <br />ofC.R.S. S S 37-92-102(3),37-92-103(3), (4), (10), <br /> <br />8. Amount of water claimed (ABSOLUTE): Instream flow of 2.75 c.f,s, <br />(April 1 - October 31); 2 c.f,s. (November 1 - March 31) <br /> <br />THE WATER REFEREE RULES: <br /> <br />The application is granted and a decree in the amount of (ABSOLUTE) <br />Instream flow of 2.75 c.f.s. (April 1 - October 31); 2 c,f,s. (November 1 - March 31) <br />is hereby entered to preserve the natural environment to a reasonable degree through <br />the upstream and downstream points as described in paragraph 4 above, The <br />appropriation date for this water right is May 11, 1998. <br /> <br />The priority herein awarded was filed in the water court in the year of 1998 <br />and shall be junior to all priorities filed in previous years, As between all rights filed <br />in the same calendar year, priorities shall be determined by historical date of <br />appropriation and not affected by the date of entry of ruling, The Applicant shall <br />install and maintain such measuring devices and keep such records as the Division <br />Engineer may require for administration of this right. <br /> <br />It is ORDERED that this Ruling shall be filed with the water clerk subject to judicial <br />review. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.