Laserfiche WebLink
<br />..:. <br /> <br />. <br /> <br />. <br /> <br />IT IS THEREFORE ORDERED AND DECREEOi <br /> <br />~~~g_2~2_222~~~~_Qf_~12i~2~~: <br /> <br />The tolorado Water Conservation Board <br />1313 Sherman Street, Room 823 <br />Denver, CO 80203 <br /> <br />~~IsL~I~!:!I <br /> <br />Name of natural stream: Crystal Creek <br /> <br />~Q~~~iQ~: Legal description of beginning and end points of <br />minimum stream flow claimed: The natural stream channel from <br />headwaters in SW/4 NW/4 523, T51~, R3E, N.M.P.M. as the upstream <br />terminus and the confluence with Taylor River in NE/4 NW/4 517, <br />TI5S. R63W, 6th P.M. as the downstream terminus being a distance <br />of approximately 8.5 miles. This segment can be located on the <br />Fairview Peak' Crystal Peak and Matchless Mtn. U.S.G.S. <br />quadrangle(s). <br /> <br />~rLQ~L~~_~~l~: June 3, 1982 provided, however, that this <br />right shall be Junior to all priorities awarded in cases filed <br />prior to 19d3, and otherwise Junior as provided in section <br />37-92-306, C.R.S. (1973). <br /> <br />~~Q~~1_Qt_~21gr: Flow in c.f.s.: 4.0 c.f.s. absolute <br /> <br />~~~_~t_~~~~r: To maintain such minimum flows as are <br />required to preserve the natural environment to a reasonable <br />degree pursuant to sections 37-92-102 and 103. C.R.S. (1984 Cum. <br />SUpp.). No diversion of the water right herein will be made from <br />the natural stream channel. <br /> <br />IT IS FURTHER ORDERED that the applicant Shall install and <br />maintain such water measurement devices. recording devices. con- <br />tent gauges and inlet and outlet measurement and recording <br />devices. as toe case may be, as are deemea essential by the <br />Office of the State Engineer, and the same, shall be installed and <br />operated in accordance with instructions from said Office. <br /> <br />-2- <br />